Anne (et al),
?The P-Team just had a discussion about Naeem's recent finding... NCRs in L2PRD are not matching the CAVSN's of the VTRF travelers.
What we have found, is that in some cases the NCRs were hand types rather auto-populated by the VTRF traveler and thus incorrect numbers are being used. Not only for the CAVSN's but also the SeqNum of the Travelers they should be referring to.
So,.... I was trying to show a list of possible problem, BUT I just lost remote desktop connection. I will finish my investigation and get you the rest of the information as soon as I can connect to JLab again.
This is just a heads up. If anyone finds a disconnect in CAVSNs between VTRF travelers and NCRs, please notify pansophy at jlab.org and we will try to work with the test engineers to resolve the differences.
Valerie / Pansophy Team
________________________________
From: E. Anne McEwen <mcewen at jlab.org>
Sent: Thursday, April 23, 2020 10:10 AM
To: Liang Zhao <lzhao at jlab.org>
Cc: Megan McDonald <megan at jlab.org>; Naeem Huque <huque at jlab.org>; Jacob Harris <jharris at jlab.org>; Valerie Bookwalter <bookwalt at jlab.org>
Subject: Fwd: J1.3-09 Document Status for cavity tests
Hi Liang
Could you please take a look at the open cavity travelers and NCR for VTA on all L2 to add in any missing test informtion
Naeem has been asked to close as much documents as possible for L2 .For the remaining cavities that were not used likely the final disposition will be REJECT. Naeem will be able to go in and close the traveller/NCRs once there is a final disposition and data entered
Please let us know if you have any questions
Anne
Get Outlook for Android<https://aka.ms/ghei36>
________________________________
From: Naeem Huque <huque at jlab.org>
Sent: Wednesday, April 22, 2020 10:06:41 AM
To: E. Anne McEwen <mcewen at jlab.org>
Subject: Re: J1.3-09 Document Status
Thanks Anne, I'll send these out to people
________________________________
From: E. Anne McEwen <mcewen at jlab.org>
Sent: Wednesday, April 22, 2020 10:03 AM
To: Naeem Huque <huque at jlab.org>
Subject: FW: J1.3-09 Document Status
Hi Naeem
Here is the list from J1.3-09 for documents remaining
However now that we hear from Joe that testing is still not done , there is likely more to come
Anne
From: Valerie Bookwalter <bookwalt at jlab.org>
Sent: Wednesday, April 22, 2020 8:20 AM
To: E. Anne McEwen <mcewen at jlab.org>
Cc: Tony Reilly <areilly at jlab.org>; Joe Preble <preble at jlab.org>
Subject: J1.3-09 Document Status
Here is the current status of documents for J1.3-09
J1.3-09R Documentation Status
22Apr2020
Missing data:
>From ACTS traveler: still some data to be completed
>From SHIP traveler: Not started
Files from SHIP: all files still to be done
HOM file for cav 348
Open Travelers:
SEQ NUM
TRAV
TRAV TITLE
23
CM-ASSY-SCND
LCLS2 Production Cryomodule Assembly Traveler Cold Mass Phase 2 (WS3)
21
CM-ASSY-VV
LCLS2 Production Cryomodule Vacuum Vessel Assembly Traveler
27
CM-ASSY-FNAL
LCLS2 Production Cryomodule Final Assembly Traveler
17
CM-ACTS-PREP
LCLSII (Production Cryomodule) Install and Cool Down
23
CM-ACTS
LCLS II Production Cryomodule Acceptance Testing
19
CM-INSP-UCM
LCLS-II Upper Cold Mass Incoming Inspection
11
CM-DMAG-UCM
LCLS-II Upper Cold Mass Magnetic Hygiene Control
26
BPM-ASSY
BPM Magnet Sub-assembly Traveler
205
RFIN1
L2PRD LCLS-II Cavity RF Incoming Inspection
204
CAVRFIN7
L2PRD LCLS-II Cavity RF Incoming Inspection
209
CAV-VTA-HOM
LCLSII Cavity Production VTA HOM Survey
234
CAV-VTA-HOM
LCLSII Cavity Production VTA HOM Survey
303
CAVVTRF3
LCLSII (Production Cryomodule) Vertical cavity Testing
319
CAVVTRF3
LCLSII (Production Cryomodule) Vertical cavity Testing
333
CAVCOOL2
LCLS Cavity VTA Cooldown
329
CAVCOOL3
LCLS Cavity VTA Cooldown
Open NCRs:
SEQ NUM
TRAV
DESCRIBE
DISPOSITION
FINAL DISPOSITION
1968
CM-ACTS
Cavity 5 has a FE onset gradient of 13.5 MV/m which is lower than the Minimum Acceptance Criteria.
1967
CM-ACTS
Cavity 4 has a FE onset gradient of 13.5 MV/m which is lower than the Minimum Acceptance Criteria.
1702
CAVINSP4
Tee Header pipe bent.
Hold/Re-measure
1762
CAVINSP7
Distance from cavity beam line to 2 phase header pipe out of tolerance 0.1 mm
1872
CAVVTRF2
FE onset 18 MV/m
Hold/Modify
1473
CAVVTRF2
Emax is below range, 18.5 MV/m
Hold/Re-measure
1876
CAVVTRF3
FE onset 20 MV/m
Hold/Modify
1882
CAVVTRF3
Qo at 16MV/m is 2.3e10, should be 2.5e10 or above.
1835
CAVVTRF3
Final FE onset 19.5 MV/m
Hold/Modify
1443
CAVVTRF3
Cavity quenched at 18.5 MV/m last valid data point recorded was at 18.26 MV/m
Hold/Modify
1627
CAVVTRF5
Blew up field emitter and ended up having FE onset at 11 MV/m
Hold/Modify
1500
CAVVTRF6
Cavity Quench at 15.3 MV/m
1382
CAVVTRF8
Q of field probe was low at 8.61e10
1700
CAVRFIN4
M-Parameter out of spec. Freq. shift in modes plot
1583
CAVRFIN5
M Parameter above 10kHz 38.58 kHz
Proceed to next WorkCenter
1761
CAVRFIN7
M-Parameter larger than 10 kHz measures 14.76 kHz
Open D3s:
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/pansophy/attachments/20200423/1920b458/attachment-0001.html>
More information about the Pansophy
mailing list