I just set up DocuShare Routing (Approvals) for 7 STP procedures. Here is the list of them
VTA Test Stand Pumping Procedure - re-establish a high vacuum on a test stand in a VTA dewar
CP-STP-VTA-TST-PUMPUP
VSA Test Stand Pumping Procedure - Maintain clean vacuum that should have been established during a VAA slow pumpdown
CP-STP-CSA-TST-PUMPM
VAA Venting Procedure - prepare the manifold and piping of a test stand for a clean detachment of a cavity in the VAA clean room
CP-STP-VAA-TST-PVENT
VAA Test Stand Setup for Clean Cavity Attachment Procedure - prepare the vacuum manifold and pimping of a test stand for a clean attachment of a cavity or device for testing in the VAA cleaning
CP-STP-VAA-TST-CAVATT
VAA Test Stand Slow Pumping Procedure - properly pump down a cavity or test device in the VAA cleanroom
CP-STP-VAA-TST-PUMPSL
VAA Fast Pumping Procedure - properly pump down test stand in the VA clean room when particle free pumping is not required
CP-STP-VAA-TST-PUMPFS
Vacuum Preparation for Crane Move Procedure - properly isolate the vacuum system of a test stand prior to relocation by crane or can be used any time a test stand is put into an isolated vacuum standby state
CP-STP-CRANE-CAV-PREP
Megan
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/pansophy/attachments/20200608/f7474eef/attachment.html>
More information about the Pansophy
mailing list