Good morning Pansophy Team,
A new revision of L2HE-INSP-FWM is in the Ready for Approvals folder. The traveler was revised based on the lessons learned from the inspection of the first two manifolds.
Added Step 1 Note on acceptable deviations from the Port Window Drawing (F10040909) - these are normal deviations for a stock blank flange. Added Step 1 Images Comment field. Added Step 2 instructions on when an NCR is needed for surface finish - based on input from Brian Hartsell (FNAL) and FNAL's Vacuum Window Safety Chapter requirement for surface finish of at least a 64 uinch. Added Step 3 instructions on dimensions requiring an NCR - since this manifold is removed from the cryomodule prior to shipment to SLAC, only dimensions critical to vacuum safety will require an NCR.
Tiffany Ganey
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/pansophy/attachments/20220608/46b7c558/attachment.html>
More information about the Pansophy
mailing list