[Pansophy] L2HE R0 Procedures
Tiffany Ganey
ganey at jlab.org
Tue Mar 1 11:47:11 EST 2022
Hi Pansophy Team,
Last year, in preparation for the PRR in October, we put "R0" versions of many procedures in the Draft folder so that we could claim that the procedure drafts existed / were being worked. Since then, I believe all of the R0 procedures have been either issued as R1 versions or determined that the R0 procedure is not needed (it was incorporated into a different document). The ones that I know about are reported in the chart below. Let me know if you want me to delete these R0 drafts in the Procedure Drafts folder.
Draft Procedures
File Name
Title
L2HE-PR-CLNRM-CST-PREP_R0
Cavity String Assembly Tooling Prep
Delete - R1 issued
L2HE-PR-CLNRM-CST-PREP_R0
Cavity String Assembly Purge System Prep
Delete - incorporated into L2HE-CLNRM-CST-ASSY
L2HE-PR-CLNRM-GV1SA-ASSY_R0
Upstream Gate Valve Sub-Assembly and Installation
Delete - R1 issued
L2HE-PR-CLNRM-GV2SA-ASSY_R0
Downstream Gate Valve / BPM Sub-Assembly and Installation
Delete - R1 issued
L2HE-PR-CLNRM-NEG-ASSY_R0
Downstream Pump Assembly and NEG Pump Initial Activation
Delete - R1 issued as -NEG-PREP
L2HE-PR-CLNRM-PURGE-PFFA_R0
Purge System Particulate Free Flange Assembly
Delete - incorporated into L2HE-CLNRM-CST-ASSY
Tiffany Ganey
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/pansophy/attachments/20220301/8e4ce75f/attachment.html>
More information about the Pansophy
mailing list