Hi Megan,
The CM drill down looks nice. I do not know many of the SNs for the CM level of assembly but the list looks comprehensive to me and well organized. For the 4th bullet in your email - the secondary window and waveguides (that are installed as part of CM assembly) are disassembled, stored in a cabinet, and then re-installed; however, the primaries (that are welded together into WINWGD) have other work performed. It is not clear to me how to distinguish a primary from a secondary based on WINSN and WGDSN only.
As for KPIs, I have a draft C100R acceptance criteria document that lists what I think are the critical measurements / values for C100R. This may be a good place to start for adding KPI data.
https://jlabdoc.jlab.org/docushare/dsweb/Get/Document-263523/C100R%20Acceptance%20Criteria.docx
O:\srfee\Ganey\C100\Project Coordinator\Requirements\AcceptCriteria_TravelerList.xlsx<file://jlabgrp/group/srfee/Ganey/C100/Project%20Coordinator/Requirements/AcceptCriteria_TravelerList.xlsx>
Tiffany Ganey
From: Megan McDonald <megan at jlab.org>
Sent: Monday, March 20, 2023 1:57 PM
To: Tiffany Ganey <ganey at jlab.org>
Cc: SRF Pansophy (pansophy at jlab.org) <pansophy at jlab.org>; Tony Reilly <areilly at jlab.org>
Subject: C100R CM Drilldown
Tiffany,
Here is the Cryomodule Drilldown I have been working on for C100R. This includes all of the SNs found in C100R-CM-ASSY, C100R-CM-ASSY-COLD, C100R-CM-ASSY-SFR and C100R-CM-ASSY-VV. I just wanted to send it over for you to look over and I want to mention a couple of things
https://pansophy.jlab.org/pansophy/Production/DrillDowns/C100RReports/C100RDrillDownCM.cfm
* Not implemented yet but this will have a button/link to go to a drilldown for ACTs and CST. Those will be added when I create those drilldowns
* The CAVSNs will be clickable to go to their respective cavity drilldowns when those are created
* WGDSNs and WINSNs will link to their INSP travelers
* WGDSN, WINSN and CAVSN are the only components that go through inspection on this drilldown. Fischer explained it to us that the components are removed and put into a cabinet until they are needed for assembly. Just want to verify that this is correct
Can you think of anything else that needs to be added to this? Like KPIs or certain measurements. As an example of KPIs being added to the drilldown is the C100 CST drilldown (https://pansophy.jlab.org/pansophy/Production/DrillDowns/C100Reports/C100DrillDownCST.cfm?project=C100&area=C100)
I will be in the office on Tuesday, Wednesday and Thursday this week if you would like to meet and discuss further
Megan
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/pansophy/attachments/20230321/3abfe487/attachment.html>
More information about the Pansophy
mailing list