[Pansophy] FW: Final Disposition: NCR:623 on SNSPPU-CMA-SEC-INSP-R3--9

Matthew Menia menia at jlab.org
Fri Mar 31 11:07:42 EDT 2023


Will do. I just reached out and asked if he would like to schedule time to review the pages and sent the training slides to him.

From: Valerie Bookwalter <bookwalt at jlab.org>
Sent: Friday, March 31, 2023 11:01 AM
To: Matthew Menia <menia at jlab.org>
Cc: pansophy <pansophy at jlab.org>
Subject: FW: FW: [Pansophy] Final Disposition: NCR:623 on SNSPPU-CMA-SEC-INSP-R3--9
Importance: High

Matt

Can you get with Gary Cheng and go over the Service Request please?

Valerie

From: Gary Cheng <cheng at jlab.org<mailto:cheng at jlab.org>>
Sent: Friday, March 31, 2023 10:38 AM
To: Valerie Bookwalter <bookwalt at jlab.org<mailto:bookwalt at jlab.org>>
Cc: pansophy <pansophy at jlab.org<mailto:pansophy at jlab.org>>
Subject: Re: FW: [Pansophy] Final Disposition: NCR:623 on SNSPPU-CMA-SEC-INSP-R3--9

Valerie,

NCR 623 is still closed. I sent a request to pansophy already. How may I submit a service request?

Thanks,
Gary
On 3/31/2023 10:25 AM, Valerie Bookwalter wrote:
Gary,

Did you get this resolved?

If not, please put in a Service Request in Pansophy.
Thanks

Valerie

From: Pansophy <pansophy-bounces at mailman.jlab.org><mailto:pansophy-bounces at mailman.jlab.org> On Behalf Of Gary Cheng via Pansophy
Sent: Tuesday, March 28, 2023 3:47 PM
To: pansophy <pansophy at jlab.org><mailto:pansophy at jlab.org>
Cc: SRFINV at JLAB.ORG<mailto:SRFINV at JLAB.ORG>; Ed Daly <edaly at jlab.org><mailto:edaly at jlab.org>; John Fischer <fischer at jlab.org><mailto:fischer at jlab.org>; Tony Reilly <areilly at jlab.org><mailto:areilly at jlab.org>
Subject: Re: [Pansophy] Final Disposition: NCR:623 on SNSPPU-CMA-SEC-INSP-R3--9

Sorry, I closed the wrong NCR. Please re-open this one.

Gary
On 3/28/2023 3:41 PM, CHENG at JLAB.ORG<mailto:CHENG at JLAB.ORG> wrote:

An Engineer has responded to the reworked/remeasured Non-Conformance Report - sequence number 623 for traveler SNSPPU-CMA-SEC-INSP-R3--9.
THIS NCR HAS BEEN AUTOMATICALLY CLOSED BASED ON DISPOSITION

PAGE 4: FINAL DISPOSITION
Response Engr:
CHENG
Response Date:
28-Mar-2023
Disposition:
Conforming
Disposition Comment:
Communicated with CMA group lead, the missing shields have been found

PAGE 3: MODIFICATION/RE-MEASURE
Rework Staff:




Rework Date:




Rework Comment:




Verify Staff:




Verify Date:




Verify Comment:





ENGINEER RESPONSE
Response Engr:




Response Date:




Disposition:
Hold/Re-measure
Disposition Comment:




PAGE 2: FIRST DISPOSITION
Response Engr:
CHENG
Response Date:
11-Nov-2022
Disposition:
Hold/Re-measure
Disposition Comment:
At this stage, it's not sure if rectification is needed immediately. The plan is to try and install SEC 06 onto CM07, loosen the hardware at both ends of the elbow/bellows and see how well it corrects. There is a possibility that the elbow needs to be cut open and rotated, if determined necessary

PAGE 1: INITIATE AND DESCRIBE
SN:
006
SNtype:
SECSN
DRAWING NUM:
104210600-M8U-8200-A001
PART DESCRIPTION:
SUPPLY END CAN ASSY
TRAV_ID:
SNSPPU-CMA-SEC-INSP
TRAV_REV:
R3
TRAV_SEQ_NUM:
9
DESCRIBE STAFF:
CHENG
DESCRIBE DATE:
2022-11-11 08:21:00.0
DESCRIBE COMMENT:
Refer to the phase 1 and phase 2 measurements. There are multiple nonconformances, like seen on other SEC's. The most worrisome deviation is on the bridge tube angle, i.e. 4.8 degree out-of-tolerance, 5.3 degrees total deviation.
NOTIFICATION COMMENT:


The NCR is at the following URL: 623<https://pansophy.jlab.org/pansophy/Travelers/TRAVELER_FORM.cfm?project=SNSPPU&area=SNSPPU&system=CMA&TRAV_ID=SNSPPU-NCR&TRAV_REVISION=R12&page=4&maxpage=4&TRAV_SEQ_NUM=623&travstat=y&serialnum=006&SN=006&SNTYPE=SECSN>


-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/pansophy/attachments/20230331/1adf72ed/attachment-0001.html>


More information about the Pansophy mailing list