Hi Pansophy team,
I am making some updates to the C100R field probe feedthrough inspection traveler C100R-INSP-FPFT. It currently includes visual, leak check, and cold shock. I am adding dimensional check as well as updating some wording. Is it still desired to have the traveler separated into work centers?
Thanks,
Liang