Hi,

With the rebuild of J-23, they're going to replace the leaky FT, we were discussing what is the best way to handle this in Pansophy so the final drill downs are linking to the correct FT on the CM once it is rebuilt.  Per Adam, the FT and cavity are linked in a CMM inspection traveler.  I think the solution is to open a new inspection traveler to link the new SN to the cavity and write a D3 or in the comments a note about the leak.

Will this work correctly when the CM drill down is used after the rebuild?

Thanks,

Ashley Mitchell (She/Her/Hers)
Quality Engineer
SNS-PPU Project Coordinator/CAM
Cell: 757-434-2905
[https://www.jlab.org/div_dept/dir_off/public_affairs/logo/JLabEmailSig.png]
600 Kelvin Dr.
Suite 8, MS 55H
Newport News, VA 23606
www.jlab.org<http://www.jlab.org>

-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/pansophy/attachments/20240314/334db79a/attachment.html>


More information about the Pansophy mailing list