Adam,

Here are Allen's notes:

[cid:9637f48c-83fd-451b-8336-ca83ee61a42d]
________________________________
From: Adam Grabowski <adamg at jlab.org>
Sent: Monday, June 30, 2025 4:21 PM
To: Valerie Bookwalter <bookwalt at jlab.org>; Calvin Barnes <cbarnes at jlab.org>; Kirk Davis <kdavis at jlab.org>; Michelle Oast <weinmann at jlab.org>; John Fischer <fischer at jlab.org>; Liang Zhao <lzhao at jlab.org>
Cc: pansophy <pansophy at jlab.org>
Subject: Re: L2RB Traveler Progress

All,

There are tasks to be completed for your travelers already submitted to L2RB "ready for approval." Please make updates and resubmit as soon as possible. See notes below.

Reminding authors of the following:

  1.
All drawings must be in the DCG Repo (document repository)
  2.
All safety documents must be in the epas , es&h or other external to SRFOPS area
  3.
All L2HE/L2PRD or any other project documents must be
     *
upgraded to latest template,
     *
proper naming convention (L2RB or SRF-MSRF),
     *
and sent for approvals
     *
with names matching the project's WCD Register.
  4.
Travelers will be released once all referenced documents are finalized.

L2RB-INV-CAV-R1

  *   STARTED 6/25
  *   WAITING ON CALVIN BARNES

L2RB-TUNE-CAV-RFIN-R1

  *   STARTED 6/24
  *   WAITING ON KIRK DAVIS
  *   Cavity Drawing Package F10023864_rev_M – NOT PROPERLY LINKED

L2RB-CLNRM-CST-DMAG-R1

  *   WEINMANN 6/17
  *   List of items to be surveyed<https://jlabdoc.jlab.org/docushare/dsweb/View/Collection-53589> (L2HE INCLUDED FILE – MUST BE UPDATED)

L2RB-CMA-CM-DISA

  *   FISCHER 6/5
  *   F10048652 HV Magnetic Shielding<https://jlabdoc.jlab.org/docushare/dsweb/Get/Document-254206/F10048652-G-DWG1-%20HV%20Magnetic%20Shielding.pdf> – MUST BE IN DCG REPO
  *   F10009375 Magnet pkg<https://jlabdoc.jlab.org/docushare/dsweb/Get/Document-254204/F10009375-U-DWG1-Magnet.pdf>– MUST BE IN DCG REPO

L2RB-CMA-HMFT-LEAK

  *   LZHAO 6/27
  *   Drawing GMM-9433A<https://jlabdoc.jlab.org/docushare/dsweb/Get/Document-225207/GMM-B9433A.pdf> – MUST BE IN DCG REPO
  *   Leak check spec 11141-S-0029 rev. B – NEEDS LINK

L2RB-INSP-HMFT

  *   LZHAO 6/27
  *   Drawing GMM-9433A<https://jlabdoc.jlab.org/docushare/dsweb/Get/Document-225207/GMM-B9433A.pdf> – WRONG LINK

L2RB-PR-CMA-WS5-DISA

  *   FISCHER 5/30

L2RB-VTA-HMFT-CSHK

  *   LZHAO 6/27
  *   Drawing GMM-9433A<https://jlabdoc.jlab.org/docushare/dsweb/Get/Document-225207/GMM-B9433A.pdf> – WRONG LINK

SLAM STICK PROC
    FISCHER 6/6
    There is a name change on this one.



Thank you,

Adam Grabowski

SRF Test Engineer, L2HE Project CAM

Jefferson Lab
600 KELVIN DR Suite # 8

Mail Stop 55H
Newport News, VA 23606

O: 757-269-7665

C: 360-320-7003

E: adamg at jlab.org

________________________________
From: Valerie Bookwalter <bookwalt at jlab.org>
Sent: Monday, June 30, 2025 3:16 PM
To: Adam Grabowski <adamg at jlab.org>
Cc: pansophy <pansophy at jlab.org>
Subject: Re: L2RB Traveler Progress

Adam,

Many L2RB documents are waiting on authors to correct and reupload.
Allen has already reviewed and I have listed things we are waiting on below.
If you can help "hurry" this along, we appreciate the help and we will be glad to begin processing.

Reminding authors of the following would help as well:

  1.
All drawings must be in the DCG Repo
  2.
All safety documents must be in the epas , es&h or other external to SRFOPS area
  3.
All L2HE/L2PRD or any other project documents must be
     *
upgraded to latest template,
     *
proper naming convention (L2RB or SRF-MSRF),
     *
and sent for approvals
     *
with names matching the project's WCD Register.
  4.
Travelers will be released once all referenced documents are finalized.

L2RB-INV-CAV-R1

  *   STARTED 6/25
  *   WAITING ON CALVIN BARNES

L2RB-TUNE-CAV-RFIN-R1

  *   STARTED 6/24
  *   WAITING ON KIRK DAVIS
  *   Cavity Drawing Package F10023864_rev_M – NOT PROPERLY LINKED

L2RB-CLNRM-CST-DMAG-R1

  *   WEINMANN 6/17
  *   List of items to be surveyed<https://jlabdoc.jlab.org/docushare/dsweb/View/Collection-53589> (L2HE INCLUDED FILE – MUST BE UPDATED)

L2RB-CMA-CM-DISA

  *   FISCHER 6/5
  *   F10048652 HV Magnetic Shielding<https://jlabdoc.jlab.org/docushare/dsweb/Get/Document-254206/F10048652-G-DWG1-%20HV%20Magnetic%20Shielding.pdf> – MUST BE IN DCG REPO
  *   F10009375 Magnet pkg<https://jlabdoc.jlab.org/docushare/dsweb/Get/Document-254204/F10009375-U-DWG1-Magnet.pdf>– MUST BE IN DCG REPO

L2RB-CMA-HMFT-LEAK

  *   LZHAO 6/27
  *   Drawing GMM-9433A<https://jlabdoc.jlab.org/docushare/dsweb/Get/Document-225207/GMM-B9433A.pdf> – MUST BE IN DCG REPO
  *   Leak check spec 11141-S-0029 rev. B – NEEDS LINK

L2RB-INSP-HMFT

  *   LZHAO 6/27
  *   Drawing GMM-9433A<https://jlabdoc.jlab.org/docushare/dsweb/Get/Document-225207/GMM-B9433A.pdf> – WRONG LINK

L2RB-PR-CMA-WS5-DISA

  *   FISCHER 5/30

L2RB-VTA-HMFT-CSHK

  *   LZHAO 6/27
  *   Drawing GMM-9433A<https://jlabdoc.jlab.org/docushare/dsweb/Get/Document-225207/GMM-B9433A.pdf> – WRONG LINK

SLAM STICK PROC
    FISCHER 6/6
    There is a name change on this one and something else, but I forget (sorry).


Hope this helps.

Valerie

________________________________
From: Adam Grabowski <adamg at jlab.org>
Sent: Monday, June 30, 2025 1:36 PM
To: Valerie Bookwalter <bookwalt at jlab.org>
Subject: L2RB Traveler Progress

Valerie,

I still don't see a single L2RB traveler active in Pansophy. There are two documents in the approvals folder and seven in the ready for approvals, several have been there almost a month. Let me know if there is something else I can do to speed up this process, we have a lot of these travelers to update and we don't seem to be making any progress.

Thanks,


Adam Grabowski

SRF Test Engineer, L2HE Project CAM

Jefferson Lab
600 KELVIN DR Suite # 8

Mail Stop 55H
Newport News, VA 23606

O: 757-269-7665

C: 360-320-7003

E: adamg at jlab.org
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/pansophy/attachments/20250630/f0b7d04c/attachment-0001.htm>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: image.png
Type: image/png
Size: 198137 bytes
Desc: image.png
URL: <https://mailman.jlab.org/pipermail/pansophy/attachments/20250630/f0b7d04c/attachment-0001.png>


More information about the Pansophy mailing list