<html>
  <head>

    <meta http-equiv="content-type" content="text/html; charset=UTF-8">
  </head>
  <body>
    <font face="Calibri">Ed & Naeem,<br>
      <br>
      It's unclear to me if there is a consensus on how many breakdown
      travelers that PPU project wants to have for a certain assembly to
      be inspected. I hope that you can clarify what you want all SOTRs
      to prepare.<br>
      <br>
      The usual receiving inspection steps that I can think of are:<br>
      shipping crate condition check --- this would be in INV <br>
      vendor documents check --- docs upload to INV. SOTR as well as
      SMEs need to check them for completeness and correctness<br>
      visual inspection --- SRF QC or CMA<br>
      dimensional inspection --- may be done by SRF QC folks or Survey
      & Alignment folks<br>
    </font><font face="Calibri"><font face="Calibri">instrumentation
        electrical check out --- Larry's group</font><br>
      fit-up test  --- mostly done CMA<br>
      weld inspection --- by weld examiner or CWI<br>
      cold shock  --- CMA<br>
      pressure test  --- CMA<br>
      leak check  --- CMA<br>
      repackage<br>
      <br>
      Please advise. I am about to convert Ed's SNS end can travelers to
      the new format and need to know how many travelers that I need to
      write for Supply & Return End Cans.<br>
      <br>
      Thanks,<br>
      Gary<br>
      <br>
      <br>
      <br>
    </font>
  </body>
</html>