<html>
<head>
<meta http-equiv="Content-Type" content="text/html; charset=iso-8859-1">
<style type="text/css" style="display:none;"> P {margin-top:0;margin-bottom:0;} </style>
</head>
<body dir="ltr">
<div style="font-family: Calibri, Arial, Helvetica, sans-serif; font-size: 12pt; color: rgb(0, 0, 0);">
That sounds reasonable to me.  Just FYI, I have put the weld documents into the weld spec on my parts, and then uploaded all of them into the INV traveler, but use your judgment - probably you have more documents.</div>
<div>
<div id="appendonsend"></div>
<div style="font-family:Calibri,Arial,Helvetica,sans-serif; font-size:12pt; color:rgb(0,0,0)">
<br>
</div>
<hr tabindex="-1" style="display:inline-block; width:98%">
<div id="divRplyFwdMsg" dir="ltr"><font face="Calibri, sans-serif" color="#000000" style="font-size:11pt"><b>From:</b> Gary Cheng <cheng@jlab.org><br>
<b>Sent:</b> Monday, October 12, 2020 3:58 PM<br>
<b>To:</b> Katherine Wilson <kwilson@jlab.org>; Ed Daly <edaly@jlab.org>; Naeem Huque <huque@jlab.org><br>
<b>Cc:</b> Matt Marchlik <marchlik@jlab.org>; Peter Owen <powen@jlab.org>; Mark Wiseman <wiseman@jlab.org>; pansophy <pansophy@jlab.org>; Kurt Macha <macha@jlab.org>; John Fischer <fischer@jlab.org>; E. Anne McEwen <mcewen@jlab.org>; Larry King <king@jlab.org><br>
<b>Subject:</b> Re: SNS PPU inspection traveler breakdown structure</font>
<div> </div>
</div>
<div><font face="Calibri">Thanks Katherine.<br>
<br>
Using SEC as an example, I would need to write the following travelers:<br>
1. Visual inspection traveler --- for SRF QC group, i.e. Anne's group<br>
2. Dimensional inspection traveler --- for Survey & Alignment group, end cans won't fit into our CMM machine<br>
3. Weld inspection traveler --- for CWI<br>
4. Instrumentation electrical checkout --- For Larry King's group<br>
5. Vendor docs check --- for SOTR, CWI and leak check specialist<br>
6. Pressure test and leak check --- For CMA<br>
<br>
That's a lot to write for just the SEC. Then for the REC, I would need to write another 6 travelers...I don't think that's really what we want. But if PPU management prefers to have such a breakdown structure, I will write 12 travelers for the SEC and REC...someone
 please let me know.<br>
<br>
Gary<br>
</font><br>
<div class="x_moz-cite-prefix">On 10/12/2020 3:47 PM, Katherine Wilson wrote:<br>
</div>
<blockquote type="cite">
<div style="font-family:Calibri,Arial,Helvetica,sans-serif; font-size:12pt; color:rgb(0,0,0)">
The idea is to break the travelers down by workstation, so one person is responsible for the part as long as it is being inspected under that traveler.</div>
<div style="font-family:Calibri,Arial,Helvetica,sans-serif; font-size:12pt; color:rgb(0,0,0)">
<br>
</div>
<div style="font-family:Calibri,Arial,Helvetica,sans-serif; font-size:12pt; color:rgb(0,0,0)">
We are trying to minimize travelers that stay open for months while working through the inspection process, and also reduce misplaced or damaged parts as they are passed from one workstation to another, so please let that be your guide as you decide how to
 separate the travelers.  </div>
<div style="font-family:Calibri,Arial,Helvetica,sans-serif; font-size:12pt; color:rgb(0,0,0)">
<br>
</div>
<div style="font-family:Calibri,Arial,Helvetica,sans-serif; font-size:12pt; color:rgb(0,0,0)">
I think you will just have to use some judgment about what seems like a sensible way to separate travelers.  Maybe Anne has further suggestions.</div>
<div style="font-family:Calibri,Arial,Helvetica,sans-serif; font-size:12pt; color:rgb(0,0,0)">
<br>
</div>
<div style="font-family:Calibri,Arial,Helvetica,sans-serif; font-size:12pt; color:rgb(0,0,0)">
Regards,</div>
<div style="font-family:Calibri,Arial,Helvetica,sans-serif; font-size:12pt; color:rgb(0,0,0)">
Katherine</div>
<div style="font-family:Calibri,Arial,Helvetica,sans-serif; font-size:12pt; color:rgb(0,0,0)">
<br>
</div>
<div style="font-family:Calibri,Arial,Helvetica,sans-serif; font-size:12pt; color:rgb(0,0,0)">
<br>
</div>
<div>
<div style="font-family:Calibri,Arial,Helvetica,sans-serif; font-size:12pt; color:rgb(0,0,0)">
<br>
</div>
<hr tabindex="-1" style="display:inline-block; width:98%">
<div id="x_divRplyFwdMsg" dir="ltr"><font face="Calibri, sans-serif" color="#000000" style="font-size:11pt"><b>From:</b> Gary Cheng
<a class="x_moz-txt-link-rfc2396E" href="mailto:cheng@jlab.org"><cheng@jlab.org></a><br>
<b>Sent:</b> Monday, October 12, 2020 3:32 PM<br>
<b>To:</b> Ed Daly <a class="x_moz-txt-link-rfc2396E" href="mailto:edaly@jlab.org">
<edaly@jlab.org></a>; Naeem Huque <a class="x_moz-txt-link-rfc2396E" href="mailto:huque@jlab.org">
<huque@jlab.org></a><br>
<b>Cc:</b> Katherine Wilson <a class="x_moz-txt-link-rfc2396E" href="mailto:kwilson@jlab.org">
<kwilson@jlab.org></a>; Matt Marchlik <a class="x_moz-txt-link-rfc2396E" href="mailto:marchlik@jlab.org">
<marchlik@jlab.org></a>; Peter Owen <a class="x_moz-txt-link-rfc2396E" href="mailto:powen@jlab.org">
<powen@jlab.org></a>; Mark Wiseman <a class="x_moz-txt-link-rfc2396E" href="mailto:wiseman@jlab.org">
<wiseman@jlab.org></a>; pansophy <a class="x_moz-txt-link-rfc2396E" href="mailto:pansophy@jlab.org">
<pansophy@jlab.org></a>; Kurt Macha <a class="x_moz-txt-link-rfc2396E" href="mailto:macha@jlab.org">
<macha@jlab.org></a>; John Fischer <a class="x_moz-txt-link-rfc2396E" href="mailto:fischer@jlab.org">
<fischer@jlab.org></a>; Larry King <a class="x_moz-txt-link-rfc2396E" href="mailto:king@jlab.org">
<king@jlab.org></a>; <a class="x_moz-txt-link-abbreviated" href="mailto:srfinv@jlab.org">
srfinv@jlab.org</a> <a class="x_moz-txt-link-rfc2396E" href="mailto:srfinv@jlab.org">
<srfinv@jlab.org></a><br>
<b>Subject:</b> Re: SNS PPU inspection traveler breakdown structure</font>
<div> </div>
</div>
<div><font face="Calibri">Any advice?</font><br>
<br>
<div class="x_x_moz-cite-prefix">On 10/9/2020 11:59 AM, Gary Cheng wrote:<br>
</div>
<blockquote type="cite"><font face="Calibri">Ed & Naeem,<br>
<br>
It's unclear to me if there is a consensus on how many breakdown travelers that PPU project wants to have for a certain assembly to be inspected. I hope that you can clarify what you want all SOTRs to prepare.<br>
<br>
The usual receiving inspection steps that I can think of are:<br>
shipping crate condition check --- this would be in INV <br>
vendor documents check --- docs upload to INV. SOTR as well as SMEs need to check them for completeness and correctness<br>
visual inspection --- SRF QC or CMA<br>
dimensional inspection --- may be done by SRF QC folks or Survey & Alignment folks<br>
</font><font face="Calibri"><font face="Calibri">instrumentation electrical check out --- Larry's group</font><br>
fit-up test  --- mostly done CMA<br>
weld inspection --- by weld examiner or CWI<br>
cold shock  --- CMA<br>
pressure test  --- CMA<br>
leak check  --- CMA<br>
repackage<br>
<br>
Please advise. I am about to convert Ed's SNS end can travelers to the new format and need to know how many travelers that I need to write for Supply & Return End Cans.<br>
<br>
Thanks,<br>
Gary<br>
<br>
<br>
<br>
</font></blockquote>
<br>
</div>
</div>
</blockquote>
<br>
</div>
</div>
</body>
</html>