    <font face="Calibri">Any advice?</font><br>
    <br>
    <div class="moz-cite-prefix">On 10/9/2020 11:59 AM, Gary Cheng
      wrote:<br>
    </div>
    <blockquote type="cite"
      cite="mid:e36c9049-bd76-b326-f9b8-08633f560227@jlab.org">
      <meta http-equiv="Content-Type" content="text/html; charset=UTF-8">
      <font face="Calibri">Ed & Naeem,<br>
        <br>
        It's unclear to me if there is a consensus on how many breakdown
        travelers that PPU project wants to have for a certain assembly
        to be inspected. I hope that you can clarify what you want all
        SOTRs to prepare.<br>
        <br>
        The usual receiving inspection steps that I can think of are:<br>
        shipping crate condition check --- this would be in INV <br>
        vendor documents check --- docs upload to INV. SOTR as well as
        SMEs need to check them for completeness and correctness<br>
        visual inspection --- SRF QC or CMA<br>
        dimensional inspection --- may be done by SRF QC folks or Survey
        & Alignment folks<br>
      </font><font face="Calibri"><font face="Calibri">instrumentation
          electrical check out --- Larry's group</font><br>
        fit-up test  --- mostly done CMA<br>
        weld inspection --- by weld examiner or CWI<br>
        cold shock  --- CMA<br>
        pressure test  --- CMA<br>
        leak check  --- CMA<br>
        repackage<br>
        <br>
        Please advise. I am about to convert Ed's SNS end can travelers
        to the new format and need to know how many travelers that I
        need to write for Supply & Return End Cans.<br>
        <br>
        Thanks,<br>
        Gary<br>