<html>
  <head>

    <meta http-equiv="content-type" content="text/html; charset=UTF-8">
  </head>
  <body>
    <font face="Calibri">All,<br>
      <br>
      The VV and UCM vendor in China informed Fermi and JLAB
      representatives that the 1st set of RFCHE-VV-002 and RHCHE-UC-002
      is planned to ship on 3/29. It will take roughly a month for the
      shipment to arrive at JLAB. So, expect to see the 1st VV and UCM
      toward the end of April. It is preferred to inspect the first set
      of VV and UCM right away. we will need to decide whether to have
      both or one of the 1st VV and UCM delivered directly to TL. <br>
      <br>
      After the 1st set, the vendor plans to ship one set of VV plus UCM
      every month. It would be good to check and make sure there is
      sufficient storage room at Blue Crab for the future VVs and UCMs
      since inspection may not happen right away after receiving.<br>
      <br>
      Attached is the vendor's shipping plan addressing mainly the
      changes made to the UCM shipping fixture. <br>
      <br>
      Thanks,<br>
      Gary<br>
    </font>
  </body>
</html>