<html><head>
<meta http-equiv="Content-Type" content="text/html; charset=utf-8">
  </head>
  <body>
    <font face="Calibri">Sorry, I closed the wrong NCR. Please re-open
      this one.<br>
      <br>
      Gary<br>
    </font><br>
    <div class="moz-cite-prefix">On 3/28/2023 3:41 PM, <a class="moz-txt-link-abbreviated" href="mailto:CHENG@JLAB.ORG">CHENG@JLAB.ORG</a>
      wrote:<br>
    </div>
    <blockquote type="cite" cite="mid:1404876290.209.1680032492441@smtpmail.jlab.org">
      
      <p>
        An Engineer has responded to the reworked/remeasured
        Non-Conformance Report - sequence number 623 for traveler
        SNSPPU-CMA-SEC-INSP-R3--9.
      </p>
      <p>
        <table cellspacing="0" cellpadding="0" border="1">
          <tbody>
            <tr>
              <td colspan="2"> <strong>THIS NCR HAS BEEN AUTOMATICALLY
                  CLOSED BASED ON DISPOSITION</strong> </td>
            </tr>
            <tr>
              <td colspan="2">  </td>
            </tr>
            <tr>
              <td colspan="2"> <strong>PAGE 4: FINAL DISPOSITION</strong>
              </td>
            </tr>
            <tr>
              <td>Response Engr: </td>
              <td>CHENG  </td>
            </tr>
            <tr>
              <td>Response Date: </td>
              <td>28-Mar-2023  </td>
            </tr>
            <tr>
              <td>Disposition: </td>
              <td>Conforming  </td>
            </tr>
            <tr>
              <td>Disposition Comment: </td>
              <td>Communicated with CMA group lead, the missing shields
                have been found  </td>
            </tr>
            <tr>
              <td colspan="2">  </td>
            </tr>
            <tr>
              <td colspan="2"><strong>PAGE 3: MODIFICATION/RE-MEASURE</strong>
              </td>
            </tr>
            <tr>
              <td>Rework Staff: </td>
              <td> <br>
                <br>
                <br>
                <br>
                <br>
              </td>
            </tr>
            <tr>
              <td>Rework Date: </td>
              <td> <br>
                <br>
                <br>
                <br>
                <br>
              </td>
            </tr>
            <tr>
              <td>Rework Comment: </td>
              <td> <br>
                <br>
                <br>
                <br>
                <br>
              </td>
            </tr>
            <tr>
              <td>Verify Staff: </td>
              <td> <br>
                <br>
                <br>
                <br>
                <br>
              </td>
            </tr>
            <tr>
              <td>Verify Date: </td>
              <td> <br>
                <br>
                <br>
                <br>
                <br>
              </td>
            </tr>
            <tr>
              <td>Verify Comment: </td>
              <td> <br>
                <br>
                <br>
                <br>
                <br>
              </td>
            </tr>
            <tr>
              <td colspan="2">  </td>
            </tr>
            <tr>
              <td colspan="2"> <strong>ENGINEER RESPONSE</strong> </td>
            </tr>
            <tr>
              <td>Response Engr: </td>
              <td> <br>
                <br>
                <br>
                <br>
                <br>
              </td>
            </tr>
            <tr>
              <td>Response Date: </td>
              <td> <br>
                <br>
                <br>
                <br>
                <br>
              </td>
            </tr>
            <tr>
              <td>Disposition: </td>
              <td>Hold/Re-measure  </td>
            </tr>
            <tr>
              <td>Disposition Comment: </td>
              <td> <br>
                <br>
                <br>
                <br>
                <br>
              </td>
            </tr>
            <tr>
              <td colspan="2"> <strong>PAGE 2: FIRST DISPOSITION</strong>
              </td>
            </tr>
            <tr>
              <td>Response Engr: </td>
              <td>CHENG  </td>
            </tr>
            <tr>
              <td>Response Date: </td>
              <td>11-Nov-2022  </td>
            </tr>
            <tr>
              <td>Disposition: </td>
              <td>Hold/Re-measure  </td>
            </tr>
            <tr>
              <td>Disposition Comment: </td>
              <td>At this stage, it's not sure if rectification is
                needed immediately. The plan is to try and install SEC
                06 onto CM07, loosen the hardware at both ends of the
                elbow/bellows and see how well it corrects.
                There is a possibility that the elbow needs to be cut
                open and rotated, if determined necessary  </td>
            </tr>
            <tr>
              <td colspan="2">  </td>
            </tr>
            <tr>
              <td colspan="2"> <strong>PAGE 1: INITIATE AND DESCRIBE</strong>
              </td>
            </tr>
            <tr>
              <td>SN: </td>
              <td> 006  </td>
            </tr>
            <tr>
              <td>SNtype: </td>
              <td> SECSN  </td>
            </tr>
            <tr>
              <td>DRAWING NUM: </td>
              <td> 104210600-M8U-8200-A001  </td>
            </tr>
            <tr>
              <td>PART DESCRIPTION: </td>
              <td> SUPPLY END CAN ASSY  </td>
            </tr>
            <tr>
              <td>TRAV_ID: </td>
              <td> SNSPPU-CMA-SEC-INSP  </td>
            </tr>
            <tr>
              <td>TRAV_REV: </td>
              <td> R3  </td>
            </tr>
            <tr>
              <td>TRAV_SEQ_NUM: </td>
              <td> 9  </td>
            </tr>
            <tr>
              <td>DESCRIBE STAFF: </td>
              <td> CHENG  </td>
            </tr>
            <tr>
              <td>DESCRIBE DATE: </td>
              <td> 2022-11-11 08:21:00.0  </td>
            </tr>
            <tr>
              <td>DESCRIBE COMMENT: </td>
              <td> Refer to the phase 1 and phase 2 measurements. There
                are multiple nonconformances, like seen on other SEC's.
                The most worrisome deviation is on the bridge tube
                angle, i.e. 4.8 degree out-of-tolerance, 5.3 degrees
                total deviation.  </td>
            </tr>
            <tr>
              <td>NOTIFICATION COMMENT: </td>
              <td>  </td>
            </tr>
          </tbody>
        </table>
      </p>
      <p> The NCR is at the following URL:
        <a target="_blank" href="https://pansophy.jlab.org/pansophy/Travelers/TRAVELER_FORM.cfm?project=SNSPPU&area=SNSPPU&system=CMA&TRAV_ID=SNSPPU-NCR&TRAV_REVISION=R12&page=4&maxpage=4&TRAV_SEQ_NUM=623&travstat=y&serialnum=006&SN=006&SNTYPE=SECSN" moz-do-not-send="true">623</a>
      </p>
    </blockquote>
    <br>
  </body>
</html>