<html><head>
<meta http-equiv="Content-Type" content="text/html; charset=utf-8">
</head>
<body>
<font face="Calibri">Sorry, I closed the wrong NCR. Please re-open
this one.<br>
<br>
Gary<br>
</font><br>
<div class="moz-cite-prefix">On 3/28/2023 3:41 PM, <a class="moz-txt-link-abbreviated" href="mailto:CHENG@JLAB.ORG">CHENG@JLAB.ORG</a>
wrote:<br>
</div>
<blockquote type="cite" cite="mid:1404876290.209.1680032492441@smtpmail.jlab.org">
<p>
An Engineer has responded to the reworked/remeasured
Non-Conformance Report - sequence number 623 for traveler
SNSPPU-CMA-SEC-INSP-R3--9.
</p>
<p>
<table cellspacing="0" cellpadding="0" border="1">
<tbody>
<tr>
<td colspan="2"> <strong>THIS NCR HAS BEEN AUTOMATICALLY
CLOSED BASED ON DISPOSITION</strong> </td>
</tr>
<tr>
<td colspan="2"> </td>
</tr>
<tr>
<td colspan="2"> <strong>PAGE 4: FINAL DISPOSITION</strong>
</td>
</tr>
<tr>
<td>Response Engr: </td>
<td>CHENG </td>
</tr>
<tr>
<td>Response Date: </td>
<td>28-Mar-2023 </td>
</tr>
<tr>
<td>Disposition: </td>
<td>Conforming </td>
</tr>
<tr>
<td>Disposition Comment: </td>
<td>Communicated with CMA group lead, the missing shields
have been found </td>
</tr>
<tr>
<td colspan="2"> </td>
</tr>
<tr>
<td colspan="2"><strong>PAGE 3: MODIFICATION/RE-MEASURE</strong>
</td>
</tr>
<tr>
<td>Rework Staff: </td>
<td> <br>
<br>
<br>
<br>
<br>
</td>
</tr>
<tr>
<td>Rework Date: </td>
<td> <br>
<br>
<br>
<br>
<br>
</td>
</tr>
<tr>
<td>Rework Comment: </td>
<td> <br>
<br>
<br>
<br>
<br>
</td>
</tr>
<tr>
<td>Verify Staff: </td>
<td> <br>
<br>
<br>
<br>
<br>
</td>
</tr>
<tr>
<td>Verify Date: </td>
<td> <br>
<br>
<br>
<br>
<br>
</td>
</tr>
<tr>
<td>Verify Comment: </td>
<td> <br>
<br>
<br>
<br>
<br>
</td>
</tr>
<tr>
<td colspan="2"> </td>
</tr>
<tr>
<td colspan="2"> <strong>ENGINEER RESPONSE</strong> </td>
</tr>
<tr>
<td>Response Engr: </td>
<td> <br>
<br>
<br>
<br>
<br>
</td>
</tr>
<tr>
<td>Response Date: </td>
<td> <br>
<br>
<br>
<br>
<br>
</td>
</tr>
<tr>
<td>Disposition: </td>
<td>Hold/Re-measure </td>
</tr>
<tr>
<td>Disposition Comment: </td>
<td> <br>
<br>
<br>
<br>
<br>
</td>
</tr>
<tr>
<td colspan="2"> <strong>PAGE 2: FIRST DISPOSITION</strong>
</td>
</tr>
<tr>
<td>Response Engr: </td>
<td>CHENG </td>
</tr>
<tr>
<td>Response Date: </td>
<td>11-Nov-2022 </td>
</tr>
<tr>
<td>Disposition: </td>
<td>Hold/Re-measure </td>
</tr>
<tr>
<td>Disposition Comment: </td>
<td>At this stage, it's not sure if rectification is
needed immediately. The plan is to try and install SEC
06 onto CM07, loosen the hardware at both ends of the
elbow/bellows and see how well it corrects.
There is a possibility that the elbow needs to be cut
open and rotated, if determined necessary </td>
</tr>
<tr>
<td colspan="2"> </td>
</tr>
<tr>
<td colspan="2"> <strong>PAGE 1: INITIATE AND DESCRIBE</strong>
</td>
</tr>
<tr>
<td>SN: </td>
<td> 006 </td>
</tr>
<tr>
<td>SNtype: </td>
<td> SECSN </td>
</tr>
<tr>
<td>DRAWING NUM: </td>
<td> 104210600-M8U-8200-A001 </td>
</tr>
<tr>
<td>PART DESCRIPTION: </td>
<td> SUPPLY END CAN ASSY </td>
</tr>
<tr>
<td>TRAV_ID: </td>
<td> SNSPPU-CMA-SEC-INSP </td>
</tr>
<tr>
<td>TRAV_REV: </td>
<td> R3 </td>
</tr>
<tr>
<td>TRAV_SEQ_NUM: </td>
<td> 9 </td>
</tr>
<tr>
<td>DESCRIBE STAFF: </td>
<td> CHENG </td>
</tr>
<tr>
<td>DESCRIBE DATE: </td>
<td> 2022-11-11 08:21:00.0 </td>
</tr>
<tr>
<td>DESCRIBE COMMENT: </td>
<td> Refer to the phase 1 and phase 2 measurements. There
are multiple nonconformances, like seen on other SEC's.
The most worrisome deviation is on the bridge tube
angle, i.e. 4.8 degree out-of-tolerance, 5.3 degrees
total deviation. </td>
</tr>
<tr>
<td>NOTIFICATION COMMENT: </td>
<td> </td>
</tr>
</tbody>
</table>
</p>
<p> The NCR is at the following URL:
<a target="_blank" href="https://pansophy.jlab.org/pansophy/Travelers/TRAVELER_FORM.cfm?project=SNSPPU&area=SNSPPU&system=CMA&TRAV_ID=SNSPPU-NCR&TRAV_REVISION=R12&page=4&maxpage=4&TRAV_SEQ_NUM=623&travstat=y&serialnum=006&SN=006&SNTYPE=SECSN" moz-do-not-send="true">623</a>
</p>
</blockquote>
<br>
</body>
</html>