<p>Hello CHENG <br>
                
                Your request has been successfully received. <br>
                Soon a pansophy team member will be assigned to your request. <br>    
        They may reach out to you for more information if needed. <br>
                You will recieve another email after your request has been completed. <br><br><br>
        Request Type: TravRequest   <BR/>  
                Priority Level: 3 <BR/>
        Request Notes: The traveler's R1 has the JL0042398 Rev B drawing set. New magnetic shields starting with S/N 034 are made to the Rev C drawing set. Should I make a R2 of the traveler with new drawings, or, simply upload the new drawing set as a new revision to the Rev B drawing's hyperlink in travelers included files? Please note that previous magnetic shields were made and inspected per the Rev B drawings <BR/>
        
        Project: ER5C <BR/>
                <br><br><br>

    Traveler Id: ER5C-INSP-IMAG <BR/>
        Traveler Seq Num: 034 & beyond <BR/>
        
        Traveler Action: Other <BR/>
        
    QMS Reason: Don't know what this field asks for <BR/>

<br><br><br>

        Have a great day. <br>
                Pansophy Team</p>