<p>Hello BOOKWALT <br>

                                        Your request has been completed. <br><br><br>
                                        Request Type: General Request   <BR/>
                                        Request ID: 234 <BR/>
                                        Priority Level: 1 <BR/>
                                        Request Notes: please update the following travelers to include a link to the newly released Copper Plating Inspection Procedure SRF-MSPR-INSP-CPPL-R1 to the following travelers. L2HE-INSP-BLBP, L2HE-INSP-BLBS, L2HE-INSP-BLBU, L2HE-INSP-BLXD, L2HE-INSP-BPM <BR/>
                                        Date Completed: 2023-8-15<BR>
                                        Completed By: BOOKWALT<BR/>
                                        Completion Notes: Liang,
 
I have “hand edited” the travelers to add in the Plating Procedure.
To reiterate – this is not our normal procedure to bypass the system.
 
There 2 already had the procedure added during their last revision update
L2HE-INSP-BLBP-R3
L2HE-INSP-BLBS-R3
 
I added the same link from above to the following travelers and added a note to the revision
L2HE-INSP-BLBU-R3
L2HE-INSP-BLXD-R1
L2HE-INSP-BPM-R3
 
Please be sure to INFORM ANYONE AND EVERYONE WHO NEEDS TO KNOW ABOUT THIS CHANGE
Thanks!

                                        
                                        <br><br><br>
                                        Have a great day. <br>
                                        Pansophy Team</p>