Dear PEPPo Collaborator:<br>
<br>
Activities are already underway in preparation for the installation of
the experimental apparatus later this summer.&nbsp; This means work is going
on both at surface level in the Injector Service Building (ISB) and
tunnel level in the injector region of the accelerator enclosure.&nbsp;&nbsp; You
will begin to receive regular installation updates about new or
on-going activities.&nbsp; You should read these and ask questions if you
are unclear.&nbsp; Presently, a handful of us are in a position to be
working in these areas, but at the summer progresses many more
collaborators will be in this position.<br>
<br>
1. <u><b>Cable Penetrations Opened</b></u> - Two cable-way
penetrations which connect the ISB to the tunnel at locations IN02B23
&amp; IN02B24 were opened today, meaning the stones which fill the
penetration have been dumped out of each preparation in preparation for
pulling new cables (HV, signal, magnet, etc) through them.&nbsp; For the
duration these penetrations are open the work area around and above the
racks is elevated from ODH-0 to ODH-1.&nbsp;&nbsp; For those who already have
Oxygen Deficiency Hazard (ODH) training, this means the two-person
buddy-rule is in effect.&nbsp; Signs have been placed to define the area and
an ODH monitor has been placed above the region, and will be activated
Thursday morning 6/2.&nbsp; As usual, if the ODH system ever goes into alarm
(blue beacon &amp; horn) you must exit the building.&nbsp; If this doesn't
make sense to you then you probably haven't taken ODH training, so you
shouldn't yet be working in this area.<br>
<br>
2. <u><b>Work Area Personal Protective Equipment (PPE)</b></u> - The
injector accelerator enclosure downstream of the cryounit (plastic
curtain) is now an installation area.&nbsp; Personnel in this area should
wear closed shoes (no sandals) and pants (no shorts).&nbsp; In addition, it
is recommended that those working below the open penetrations wear
safety glasses and hardhats as small stones and or materials can drop
from the surface level to the tunnel level.<br>
<br>
3. <u><b>Injector Walkway Installation Planned Next Week June 6th</b></u>
- The new injector platform at the injector accelerator enclosure is on
track for installation next week and will last 2-3 days.&nbsp; During the
installation please pay attention to any posted signs.&nbsp; The task
includes a significant amount of drilling and hammering, with some dust
and noise.&nbsp; During these activities avoid the work area if possible.<br>
<br>
As always, if questions/issues arise you can contact me on my cell
757-344-0188.<br>
<br>
Joe<br>