<html>
  <head>
    <meta content="text/html; charset=ISO-8859-1"
      http-equiv="Content-Type">
  </head>
  <body bgcolor="#FFFFFF" text="#000000">
    In looking over the plan,&nbsp; I swapped the PEPPo with the raytrace
    beam study.&nbsp;&nbsp; My argument for this is that this is simpler
    transition making the period more efficient.&nbsp;&nbsp; Sorry for the late
    change.<br>
    <br>
    Studies scheduled with 0 time are either parasitic (79Hz) or are
    tentatively scheduled.&nbsp; Tentatively scheduled beam studies will get
    time if the scheduled beam studies finish ahead of schedule or if
    there is no physics program.<br>
    <br>
    <div id="outline-container-1_1" class="outline-3">
      <h3 id="sec-1_1"><span class="section-number-3">1.1</span> Beam
        Studies for this week \\ This Week: 2012-01-18 Wed </h3>
      <div class="outline-text-3" id="text-1_1">
        <table rules="groups" frame="hsides" border="2" cellpadding="6"
          cellspacing="0">
          <caption><br>
          </caption>
          <colgroup><col class="left"><col class="right"><col
              class="left"><col class="left"><col class="left">
          </colgroup>
          <thead>
            <tr>
              <th scope="col" class="left">Scheduled Tasks</th>
              <th scope="col" class="right">Expected</th>
              <th scope="col" class="left">Actual</th>
              <th scope="col" class="left">Campaign</th>
              <th scope="col" class="left">Beam</th>
            </tr>
            <tr>
              <th scope="col" class="left"><br>
              </th>
              <th scope="col" class="right">Duration</th>
              <th scope="col" class="left">Duration</th>
              <th scope="col" class="left"><br>
              </th>
              <th scope="col" class="left">Termination</th>
            </tr>
            <tr>
              <th scope="col" class="left"><br>
              </th>
              <th scope="col" class="right">(h)</th>
              <th scope="col" class="left"><br>
              </th>
              <th scope="col" class="left"><br>
              </th>
              <th scope="col" class="left"><br>
              </th>
            </tr>
          </thead>
          <tbody>
            <tr>
              <td class="left"><a
                  href="http://opsweb.acc.jlab.org/CSUEApps/atlis/task/11858">Search
                  for 79Hz</a></td>
              <td class="right">0</td>
              <td class="left"><br>
              </td>
              <td class="left">C100</td>
              <td class="left">Parasitic</td>
            </tr>
            <tr>
              <td class="left">Initial fOpts/Allsaves</td>
              <td class="right">1</td>
              <td class="left"><br>
              </td>
              <td class="left">Program</td>
              <td class="left">B &amp; C</td>
            </tr>
            <tr>
              <td class="left"><a
                  href="http://opsweb.acc.jlab.org/CSUEApps/atlis/task/11882">C100:
                  Stability</a></td>
              <td class="right">8</td>
              <td class="left"><br>
              </td>
              <td class="left">C100</td>
              <td class="left">C</td>
            </tr>
            <tr>
              <td class="left"><a
                  href="http://opsweb.acc.jlab.org/CSUEApps/atlis/task/11865">Ray-trace
                  validation</a></td>
              <td class="right">1</td>
              <td class="left"><br>
              </td>
              <td class="left">Modeling</td>
              <td class="left">BSY</td>
            </tr>
            <tr>
              <td class="left"><a
                  href="http://opsweb.acc.jlab.org/CSUEApps/atlis/task/11885">Peppo
                  Modeling</a></td>
              <td class="right">0</td>
              <td class="left"><br>
              </td>
              <td class="left">Peppo</td>
              <td class="left">5MeV</td>
            </tr>
            <tr>
              <td class="left"><a
                  href="http://opsweb.acc.jlab.org/CSUEApps/atlis/task/11849">Mott
                  DAQ Test cont.</a></td>
              <td class="right">0</td>
              <td class="left"><br>
              </td>
              <td class="left">1% Mott</td>
              <td class="left">5MeV</td>
            </tr>
            <tr>
              <td class="left">Restoration</td>
              <td class="right">2</td>
              <td class="left"><br>
              </td>
              <td class="left">Program</td>
              <td class="left">B&amp;C</td>
            </tr>
          </tbody>
          <tbody>
            <tr>
              <td class="left">Total</td>
              <td class="right">12</td>
              <td class="left"><br>
              </td>
              <td class="left"><br>
              </td>
              <td class="left"><br>
              </td>
            </tr>
          </tbody>
        </table>
      </div>
    </div>
    <br>
    <br>
    On 01/13/2012 02:57 PM, Arne Freyberger wrote:
    <blockquote cite="mid:4F108CA1.2050505@jlab.org" type="cite">
      <meta http-equiv="content-type" content="text/html;
        charset=ISO-8859-1">
      Search for 79Hz will occur parasitically with high current
      operations to Hall-C.&nbsp;&nbsp;&nbsp; Beam to C for most (if not all) of the
      beam studies period.&nbsp;&nbsp; If C100 ends early, we'll do some studies
      (PEPPo/Mott) at the 5MeV region towards the end of the day.<br>
      <br>
      I recommend we start at 8:30am.<br>
      <h3 id="sec-1_1">Beam Studies for this week \\ This Week:
        2012-01-18 Wed </h3>
      <div class="outline-text-3" id="text-1_1">
        <table rules="groups" frame="hsides" border="2" cellpadding="6"
          cellspacing="0">
          <caption><br>
          </caption> <colgroup><col class="left"><col class="right"><col
              class="left"><col class="left"><col class="left"> </colgroup>
          <thead> <tr>
              <th scope="col" class="left">Scheduled Tasks</th>
              <th scope="col" class="right">Expected</th>
              <th scope="col" class="left">Actual</th>
              <th scope="col" class="left">Campaign</th>
              <th scope="col" class="left">Beam</th>
            </tr>
            <tr>
              <th scope="col" class="left"><br>
              </th>
              <th scope="col" class="right">Duration</th>
              <th scope="col" class="left">Duration</th>
              <th scope="col" class="left"><br>
              </th>
              <th scope="col" class="left">Termination</th>
            </tr>
            <tr>
              <th scope="col" class="left"><br>
              </th>
              <th scope="col" class="right">(h)</th>
              <th scope="col" class="left"><br>
              </th>
              <th scope="col" class="left"><br>
              </th>
              <th scope="col" class="left"><br>
              </th>
            </tr>
          </thead> <tbody>
            <tr>
              <td class="left"><a moz-do-not-send="true"
                  href="http://opsweb.acc.jlab.org/CSUEApps/atlis/task/11858">Search

                  for 79Hz</a></td>
              <td class="right">0</td>
              <td class="left"><br>
              </td>
              <td class="left">C100</td>
              <td class="left">Parasitic</td>
            </tr>
            <tr>
              <td class="left">Initial fOpts/Allsaves</td>
              <td class="right">1</td>
              <td class="left"><br>
              </td>
              <td class="left">Program</td>
              <td class="left">B &amp; C</td>
            </tr>
            <tr>
              <td class="left"><a moz-do-not-send="true"
                  href="http://opsweb.acc.jlab.org/CSUEApps/atlis/task/11882">C100:

                  Stability</a></td>
              <td class="right">8</td>
              <td class="left"><br>
              </td>
              <td class="left">C100</td>
              <td class="left">C</td>
            </tr>
            <tr>
              <td class="left"><a moz-do-not-send="true"
                  href="http://opsweb.acc.jlab.org/CSUEApps/atlis/task/11885">Peppo

                  Modeling</a></td>
              <td class="right">1</td>
              <td class="left"><br>
              </td>
              <td class="left">Peppo</td>
              <td class="left">5MeV</td>
            </tr>
            <tr>
              <td class="left"><a moz-do-not-send="true"
                  href="http://opsweb.acc.jlab.org/CSUEApps/atlis/task/11849">Mott

                  DAQ Test cont.</a></td>
              <td class="right">0</td>
              <td class="left"><br>
              </td>
              <td class="left">1% Mott</td>
              <td class="left">5MeV</td>
            </tr>
            <tr>
              <td class="left"><a moz-do-not-send="true"
                  href="http://opsweb.acc.jlab.org/CSUEApps/atlis/task/11865">Ray-trace

                  validation</a></td>
              <td class="right">0</td>
              <td class="left"><br>
              </td>
              <td class="left">Modeling</td>
              <td class="left">BSY</td>
            </tr>
            <tr>
              <td class="left">Restoration</td>
              <td class="right">2</td>
              <td class="left"><br>
              </td>
              <td class="left">Program</td>
              <td class="left">B&amp;C</td>
            </tr>
          </tbody> <tbody>
            <tr>
              <td class="left">Total</td>
              <td class="right">12</td>
              <td class="left"><br>
              </td>
              <td class="left"><br>
              </td>
              <td class="left"><br>
              </td>
            </tr>
          </tbody>
        </table>
      </div>
      <div id="postamble">
        <p class="date"><br>
        </p>
      </div>
      <pre class="moz-signature" cols="72">-- 
Arne Freyberger
Director of Accelerator Operations
Jefferson Lab           Office: (757) 269-6268  
12000 Jefferson Avenue  Cell:   (757) 876-6289  
Newport News, VA 23606  Email:  <a moz-do-not-send="true" class="moz-txt-link-abbreviated" href="mailto:freyberg@jlab.org">freyberg@jlab.org</a>
</pre>
      <br>
      <fieldset class="mimeAttachmentHeader"></fieldset>
      <br>
      <pre wrap="">_______________________________________________
Bteam mailing list
<a class="moz-txt-link-abbreviated" href="mailto:Bteam@jlab.org">Bteam@jlab.org</a>
<a class="moz-txt-link-freetext" href="https://mailman.jlab.org/mailman/listinfo/bteam">https://mailman.jlab.org/mailman/listinfo/bteam</a></pre>
    </blockquote>
    <br>
    <pre class="moz-signature" cols="72">-- 
Arne Freyberger
Director of Accelerator Operations
Jefferson Lab           Office: (757) 269-6268  
12000 Jefferson Avenue  Cell:   (757) 876-6289  
Newport News, VA 23606  Email:  <a class="moz-txt-link-abbreviated" href="mailto:freyberg@jlab.org">freyberg@jlab.org</a>
</pre>
  </body>
</html>