<p>I have a bit of problem adapting mode 3 to the usual event structure most likely still some typos in read out code but maybe an interference between boards too, so i think i mostly want to take data in sample with new and old TI, this should work transparently in decoder, to have a first glimpse at background and asymmetries. If we have i could take a short run in mode 3 with the readout which is working.</p>

<p>So in 60 minutes,<br>
we could try tune beam in Compton 15 20 minutes</p>
<p>power one peripherical crystal</p>
<p>take amplified data sample old ti 5min<br>
take amplified data new TI 5 mins<br>
take amplified data new TI buffered 5 mins<br></p>
<p>We should see an asymmetry.</p>
<p>We could take a run in mode 3 if time allows but i still need to make sure and set pedestals right so that might wait fir next week.</p>
<p>Alexandre<br></p>
<div class="gmail_quote">On Apr 2, 2012 11:31 AM,  &lt;<a href="mailto:fanchini@jlab.org">fanchini@jlab.org</a>&gt; wrote:<br type="attribution"><blockquote class="gmail_quote">
<br>
IOf Riad and alex are working to compute charge asymmetry with BCM0L02,<br>
this should be ok. They already have the stuff to use. If they want to use<br>
mode 3 (new fadc) i can say not. I did not finish and here i couldn&#39;t work<br>
on it.<br>
E.<br>
<br>
<br>
&gt; This is just a reminder that we&#39;re planning to execute our first CW beam<br>
&gt; test tomorrow planned to begin ~noon:<br>
&gt; <a href="http://opsweb.acc.jlab.org/CSUEApps/atlis/task/12270*">http://opsweb.acc.jlab.org/CSUEApps/atlis/task/12270*</a><br>
&gt;<br>
&gt; Alexandre/Riad* - What is the status of the DAQ, as I know a bunch of<br>
&gt; work was planned since last Thursday?<br>
&gt; *<br>
&gt; **Eric/Erica* - We know you won&#39;t be here and received your advice<br>
&gt; below.  Have you closed the loop w/ Alexandre or Riad for the exact<br>
&gt; measurements you&#39;d like to have made. _Assume &lt;60 minutes total test<br>
&gt; time_.<br>
&gt; *<br>
&gt; Leke/Paul* - Will one of you be around in the afternoon to test if your<br>
&gt; repair last week solved the fiber array signal problem. _Assume &lt;30 min<br>
&gt; total test time._<br>
&gt;<br>
&gt; *Tony *- If time permits do you want us to make a measurement w/ cw beam<br>
&gt; on target viewer (50-1000pA); if yes, please spell out the conditions<br>
&gt; you&#39;d want. _Assume &lt;30 minutes total test time_.<br>
&gt;<br>
&gt;<br>
&gt;<br>
&gt;<br>
&gt;<br>
&gt;<br>
&gt; _______________________________________________<br>
&gt; PEPPo mailing list<br>
&gt; <a href="mailto:PEPPo@jlab.org">PEPPo@jlab.org</a><br>
&gt; <a href="https://mailman.jlab.org/mailman/listinfo/peppo">https://mailman.jlab.org/mailman/listinfo/peppo</a><br>
&gt;<br>
<br>
<br>
_______________________________________________<br>