<!DOCTYPE html PUBLIC "-//W3C//DTD HTML 4.01 Transitional//EN">
<html>
<head>
<meta content="text/html;charset=ISO-8859-1" http-equiv="Content-Type">
</head>
<body bgcolor="#ffffff" text="#000000">
Dear PEPPo Collaborator:<br>
<br>
We should be ready to execute our PEPPo plans tomorrow Wed 5/9.<br>
Summary below and ATLIS here:
<a class="moz-txt-link-freetext" href="http://opsweb.acc.jlab.org/CSUEApps/atlis/task/12404">http://opsweb.acc.jlab.org/CSUEApps/atlis/task/12404</a><br>
<br>
Those interested to discuss these plans will meet in MCC fishbowl @
1:30pm today.<br>
<br>
<u><b>Injector Access - starts 8:30am</b></u><br>
1. Delacruz - Replace camera ITV5D00<br>
2. Wood - Replace fuses on trims for MCS5D03H/V, MCS5D04H/V, MPD5D03A<br>
3. Suleiman - Add scintillator photon veto upstream Compton<br>
4. Hansknecht - opportunity to install electrometer/triax?<br>
5. Grames - Evaluate lead shielding behind target and spectrometer<br>
<br>
<u><b>Injector Lock-Up - nominally 10:00am</b></u><br>
1. Restore injector VL beam to PEPPo cup, centered on capture solenoid<br>
2. Optimize photon veto detector (de-x-ray-opto-mizer-tron)<br>
3. Select and optimize degraded e- beam @ 6 or 3 MeV (target + lens +
collimators)<br>
4. Switch polarity and repeat in positron mode<br>
<br>
<u><b>PEPPo BS period ends after 5 hours<br>
</b></u><br>
<br>
</body>
</html>