<!DOCTYPE HTML PUBLIC "-//W3C//DTD HTML 4.01 Transitional//EN">
<html>
<head>
<meta http-equiv="content-type" content="text/html; charset=ISO-8859-1">
</head>
<body text="#000000" bgcolor="#ffffff">
Dear PEPPo Collaborators,<br>
<br>
During the last ~days before the experiment here is some useful
information:<br>
<br>
1. <u>Before sitting a shift you must sign-off in MCC binder on all
of the required reading and training</u>.<br>
<br>
2. <u>We have a brief toolbox meeting in MCC control room each day
until Friday 5/25 at ~8:15am</u>. Daily tasks should be mentioned
there so everyone knows the priorities and coordination for the day.<br>
<br>
3. <u>This Wed 5/23 there will be an introduction to PEPPo
apparatus at 2pm in MCC conference room</u>. This is an excellent
opportunity for anyone taking shifts to learn how the experiment
will run, be controlled, important considerations, etc. Following
the briefing those interested will take a walking tour in the
injector tunnel. You need ODH training and TLD to participate.<br>
<br>
4. <u>This Wed 5/23 there will be a DAQ/analysis training session
in the MCC at 3pm</u>. Those people signing up as shift workers
are encouraged to attend this session to appreciate how to run the
DAQ, decode the information and perform replay analysis during the
shifts. Contact Erica Fanchini (<a class="moz-txt-link-abbreviated" href="mailto:fanchini@jlab.org">fanchini@jlab.org</a>) or Riad Suleiman
(<a class="moz-txt-link-abbreviated" href="mailto:suleiman@jlab.org">suleiman@jlab.org</a>) for more details.<br>
<br>
4. <u>Daily RC meetings will begin this Thursday 5/24, held at
3:30pm in MCC control room</u>.<br>
<br>
5. The <u>last opportunities for SAF132 injector tunnel walk
through training prior to the start of PEPPo are this Tue and Thur
at 9am in MCC</u>. To take class sign up with Mike Aiken
(<a class="moz-txt-link-abbreviated" href="mailto:aiken@jlab.org">aiken@jlab.org</a>). You should have already taken the online
component, ODH and have a TLD (or escort w/ dosimeter). You will
not be allowed to work in the tunnel without completing the training
classes.<br>
<br>
6. <u>We will lock up injector and NL on Thursday at 1500 for
checkout of equipment and systems</u>. We should be in restricted
access by ~1800.<br>
<br>
<br>
-Joe<br>
<br>
</body>
</html>