<!DOCTYPE html PUBLIC "-//W3C//DTD HTML 4.01 Transitional//EN">
<html>
<head>
  <meta content="text/html;charset=ISO-8859-1" http-equiv="Content-Type">
</head>
<body bgcolor="#ffffff" text="#000000">
<b>Daily RC Report 5/23:</b><br>
The survey/alignment group completed survey measurements of the
injector and PEPPo components today.&nbsp; The horizontal centerlines of
components are in good alignment, as well as the fiducalized
polarimeter axis.&nbsp; There is a small negative pitch of the spectrometer
and region 3 beam line likely resulting from cantilevered region load
resulting in exit window low ~4mm.&nbsp; Consequently, we're planning to
re-align the pitch on Thursday morning.&nbsp; Otherwise, all work is going
per plan.<br>
<br>
<b>Noteworthy items:</b><br>
1. The clothing (PPE) rules requires that people working in the tunnel
and service buildings have closed toed shoes and long pants.<br>
2. Erica &amp; Riad will provide the DAQ/ANALYSIS training on Thursday
at 9:30am in MCC conference room.<br>
<br>
<b>Next 24 hours:</b><br>
<blockquote><u>Wednesday, 5/23 - SWING</u><br>
  <ul>
    <li>Compton and annihilation detector source calibrations</li>
  </ul>
  <u>Thursday, 5/24 - OWL</u><br>
  <ul>
    <li>No planned work</li>
  </ul>
  <u>Thursday, 5/24 - DAY</u><br>
  <ul>
    <li>0800 Complete alignment of region 3 and Compton</li>
    <li>1200 If alignment complete opportunities for detector checkout</li>
    <li>1500 Sweeps of INJ/NL for HCO begin<br>
    </li>
  </ul>
  <u>Thursday, 5/24 - SWING</u><br>
  <ul>
    <li>Complete configuration for detector and shielding for
commissioning</li>
    <li><br>
    </li>
  </ul>
</blockquote>
<br>
</body>
</html>