<div class="moz-text-html" lang="x-western"> <b>Daily RC Report 5/25:</b><br>
Making good progress, we've completed quad centering to define
0L02-0L02 "straight" and 5D00-5D01 "PEPPo" BPM positions and saving
recoverable baseline correctors &amp; quads for setup to FC2.&nbsp;
Overnight, first pass checkout of Compton integration mode performed w/
LV=off/on, varied rates and PITA.&nbsp; Initial results indicate analysis
code needs some modification and if successful, this checkout will
again be performed on OWL.&nbsp; In meantime, on DAY shift cryounit was
varied and beam momenta of 7.85MeV/c (max tested), 7.24MeV/c(max
spectrometer will transport) and 5.56MeV/c mid-range value setup.&nbsp;&nbsp; So,
good progress on learning process to set or measure the beam momentum.&nbsp;
SWING shift will focus on setting quadrupoles at different momentum
setup(s) to set spot size at T1 or ~T2, and if time permits first
checkout of the annihilation detectors.&nbsp; Also on DAY shift, three
methods to change target polarization while measuring pick-up voltages
were tested so we may choose/write down a procedure.<br>
<br>
<b>Noteworthy items:</b><br>
1. Summary of today's RC meeting is here:<br>
<a class="moz-txt-link-freetext" href="https://positron.jlab.org/wiki/index.php/Sat%2C_May_26%2C_2012_%28Grames%29">https://positron.jlab.org/wiki/index.php/Sat%2C_May_26%2C_2012_%28Grames%29</a><br>
<a class="moz-txt-link-freetext"
 href="https://positron.jlab.org/wiki/index.php/Fri%2C_May_25%2C_2012_%28Grames%29"></a><br>
<b>Next 24 hours:</b><br>
<blockquote>Saturday, 5/26 SWING (SL=Freyberger)<br>
  <ul>
    <li> CB10 - process to measure/set quads w/ p=5.56MeV/c for round
spots at T1 and ~T2
    </li>
    <li> CB14 2hr annihilation checkout w/ beam on ITV5D03A w/ ~few
hundred pA
    </li>
  </ul>
Sunday, 5/27 OWL (SL=Suleiman)<font size="-1"><br>
  </font>
  <ul>
    <li> CD1 - PQB setup required for CD3
    </li>
    <li> Repeat CD3 checkout if integrated method &lt;=== PRIORITY GOAL<br>
    </li>
    <li> CD2 - Mott, if time permits<br>
    </li>
    <li> Originally scheduled but on hold until priority tasks
achieved:
      <ul>
        <li> CD5 - Compton vs. analyzing magnet current
        </li>
        <li> CD4 - Compton vs. beam polarization orientation
        </li>
        <li> CD6 - Linearity test of integrated method
        </li>
      </ul>
    </li>
  </ul>
  <span class="mw-headline"><font size="+1">Sunday, 5/27 DAY goals
(SL= Poelker)</font> </span>
  <ul>
    <li> Test cryounit at lower beam energy ~3MeV/c
    </li>
    <li> CB13 Fiber array checkout</li>
  </ul>