<div class="moz-text-html" lang="x-western"> <b>Daily RC Report 5/25:</b><br>
Making good progress, we've completed quad centering to define
0L02-0L02 "straight" and 5D00-5D01 "PEPPo" BPM positions and saving
recoverable baseline correctors & quads for setup to FC2.
Overnight, first pass checkout of Compton integration mode performed w/
LV=off/on, varied rates and PITA. Initial results indicate analysis
code needs some modification and if successful, this checkout will
again be performed on OWL. In meantime, on DAY shift cryounit was
varied and beam momenta of 7.85MeV/c (max tested), 7.24MeV/c(max
spectrometer will transport) and 5.56MeV/c mid-range value setup. So,
good progress on learning process to set or measure the beam momentum.
SWING shift will focus on setting quadrupoles at different momentum
setup(s) to set spot size at T1 or ~T2, and if time permits first
checkout of the annihilation detectors. Also on DAY shift, three
methods to change target polarization while measuring pick-up voltages
were tested so we may choose/write down a procedure.<br>
<br>
<b>Noteworthy items:</b><br>
1. Summary of today's RC meeting is here:<br>
<a class="moz-txt-link-freetext" href="https://positron.jlab.org/wiki/index.php/Sat%2C_May_26%2C_2012_%28Grames%29">https://positron.jlab.org/wiki/index.php/Sat%2C_May_26%2C_2012_%28Grames%29</a><br>
<a class="moz-txt-link-freetext"
href="https://positron.jlab.org/wiki/index.php/Fri%2C_May_25%2C_2012_%28Grames%29"></a><br>
<b>Next 24 hours:</b><br>
<blockquote>Saturday, 5/26 SWING (SL=Freyberger)<br>
<ul>
<li> CB10 - process to measure/set quads w/ p=5.56MeV/c for round
spots at T1 and ~T2
</li>
<li> CB14 2hr annihilation checkout w/ beam on ITV5D03A w/ ~few
hundred pA
</li>
</ul>
Sunday, 5/27 OWL (SL=Suleiman)<font size="-1"><br>
</font>
<ul>
<li> CD1 - PQB setup required for CD3
</li>
<li> Repeat CD3 checkout if integrated method <=== PRIORITY GOAL<br>
</li>
<li> CD2 - Mott, if time permits<br>
</li>
<li> Originally scheduled but on hold until priority tasks
achieved:
<ul>
<li> CD5 - Compton vs. analyzing magnet current
</li>
<li> CD4 - Compton vs. beam polarization orientation
</li>
<li> CD6 - Linearity test of integrated method
</li>
</ul>
</li>
</ul>
<span class="mw-headline"><font size="+1">Sunday, 5/27 DAY goals
(SL= Poelker)</font> </span>
<ul>
<li> Test cryounit at lower beam energy ~3MeV/c
</li>
<li> CB13 Fiber array checkout</li>
</ul>