<b>Daily RC Report 5/27:</b><br>
We are now routinely delivering beam to production targets to
characterize background, collection and detectors.&nbsp; On last SWING
another S1 centering task was performed to learn the orbit to the
production target.&nbsp; The PEPPo video switcher died and we lost ~couple
hours to fix this ourselves.&nbsp; A Mott setup w/ quads for crested
T=5.0MeV was saved.&nbsp; On OWL The TS1 trigger scintillator was inserted
and 8MeV/c beam setup for studying backgrounds w/ 0.1mm and 1.0mm w/
spectrometer in positron mode and jaws closed.&nbsp; The conclusion is that
TS1 will need to be used and that backgrounds don't vary much vs.
spectrometer collection setting.&nbsp; On DAY spectrometer collection tests
were performed.&nbsp; Using 6MeV/c beam the spectrometer transported
+/-1.25% momentum variation; the jaw were used to characterize the beam
locations.&nbsp; The beam was used to calibrate the phs in the E1 detector.&nbsp;
The shift concluded w/ collecting e- at 6MeV/c and 3MeV/c to measure
collection efficiency and phs in E1 detector.<br>
<br>
<b>Noteworthy items:</b><br>
1. Tomorrow the lab will get busy again; and we'll have more support to
fix/correct things that need attention.&nbsp; Please send me description of
issues found over the weekend that need attention.<br>
2. During the 10 shifts (80 hours) we've been down about 8 hours (6 on
Friday network storm+viewers &amp; 2 on Sunday video switcher).<br>
3. We've completed/collected information in 15 of 16 CB tasks &amp; 4
of 10 CD tasks; thus, priority over ~coming days will be to translate
CB results into refined procedures and to support remaining CD
commissioning tasks.<br>
<br>
<b>Next 24 hours:</b><br>
<br>
Monday, 5/28 - SWING SL=Freyberger<br>
<blockquote>Program (P_beam=6.08MeV/c, T=0.1mm)<br>
At different spectrometer collections (3,4,5,6 MeV/c)<br>
  <ul>
    <li>Collect e- and log conditions (S1, SPEC, S2, Steering)</li>
    <li>Measure e- collection efficiency and energy spectrum</li>
    <li>Attempt same w/ e+ </li>
  </ul>
</blockquote>
Tuesday, 5/29 - OWL SL=Suleiman<br>
<blockquote>1. Injector access to remove E1 detector and restore
polarimeter<br>
2. Program:<br>
  <ul>
    <li>Plan A - CD8 Compton trigger assessment with e+</li>
    <li>Plan B - CD7 Trigger scintillator depolarization with e- </li>
  </ul>
</blockquote>
Tuesday, 5/29 - DAY, SL=Poelker<br>
<blockquote>1. Commission fiber array w/ e-<br>
2. Mott measurement as time permits<br>
3. Setup P_beam=8MeV/c <br>
</blockquote>