<!DOCTYPE HTML PUBLIC "-//W3C//DTD HTML 4.01 Transitional//EN">
<html>
<head>
<meta http-equiv="content-type" content="text/html; charset=ISO-8859-1">
</head>
<body text="#000000" bgcolor="#ffffff">
<div id="bodyContent">
<p><b>Daily RC Report</b>
</p>
<pre>Finished taking positron production data at 4.2 MeV. Then Joe spent some time investigating the dependence
of Spectrometer current on the Solenoids' supplies especially the Analyser Magnet. There is a real change
in Spectrometer current of about 0.4 A (evident by beam motion on viewer) when changing
the Analyser Magnet between +/-60 A. So we put the spectrometer current under a PID to keep
the current constant. In the afternoon, we changed to 3.2 MeV and started production data taking.
</pre>
<p><br>
Next 24 hours:
</p>
<p>Wednesday, 6/6 - SWING SL=Adeleke Adeyemi
</p>
<pre> Positron Data taking at 3.2 MeV/c
</pre>
<p>Thursday, 6/7 - OWL SL=Jean-Sebastien REAL
</p>
<pre> Background and production at 3.2 MeV/c
</pre>
<p>Thursday, 6/7 - DAY, SL=Erica Fanchini
</p>
<pre> Positron Data taking at 3.2 MeV/c
Mott measurement
At the end of shift, will change to 5.5 MeV/c
</pre>
</div>
<pre class="moz-signature" cols="72">
</pre>
</body>
</html>