<html>
<head>
<meta http-equiv="content-type" content="text/html; charset=ISO-8859-1">
</head>
<body bgcolor="#FFFFFF" text="#000000">
<b>We still need shift takers this weekend, please sign up!!!</b>
Opportunities to contribute to the PEPPo effort are rapidly
diminishing, sign up now before you miss it!!!
(<a class="moz-txt-link-freetext" href="https://misportal.jlab.org/mis/apps/physics/shiftSchedule/index.cfm?experimentRunId=PEPPo">https://misportal.jlab.org/mis/apps/physics/shiftSchedule/index.cfm?experimentRunId=PEPPo</a>)<br>
<br>
The end game was fleshed out and agreed upon at yesterday's 3:30pm
meeting: (<a class="moz-txt-link-freetext" href="https://positron.jlab.org/wiki/index.php/End_Game">https://positron.jlab.org/wiki/index.php/End_Game</a>). The
plan has production 0.1mm W target data collection up to Sunday
morning. At this time production data collection ends and a series
of systematic studies and measurements are scheduled for the next
three shifts. Sunday <br>
Day/Swing and Monday Owl will be a very active shifts. These
three shifts will be followed by detailed Mott measurements, which
will end Wednesday morning.<br>
<br>
Thursday and Friday are Beam studies period, and final Injector and
QWeak studies are scheduled for these last four shifts (no PEPPo
involvement required).<br>
<br>
<br>
The most recent Swing and Owl shifts continued data collection off
of 0.1mm W target at 3.2MeV/c. With about 2.5-3.0M events per shift
collected. <br>
<br>
RC meeting today at 3:30pm in MCC.<br>
Arne <br>
<br>
<pre class="moz-signature" cols="72">--
Arne Freyberger
Director of Accelerator Operations
Jefferson Lab Office: (757) 269-6268
12000 Jefferson Avenue Cell: (757) 876-6289
Newport News, VA 23606 Email: <a class="moz-txt-link-abbreviated" href="mailto:freyberg@jlab.org">freyberg@jlab.org</a>
</pre>
</body>
</html>