[PRad] [New Logentry] run#586 for gain equalizing summary

liye at jlab.org liye at jlab.org
Sun May 22 03:50:06 EDT 2016


Logentry Text:
--
run number 586
Thanks to MCC we have about 3 hours stable beam for this run.
beam current ~ 5nA, beam position(2c24) : x = +- 0.4mm , y = +-0.4mm ;
Dynode total sum signal is good enough to equalize HyCal PbWO4 modules;
Equalized 31 modules from W1 to W31, most of HV are about 1100V for 150mV Dynode total sum signal and have ~3000 ADC channels of Anode.
Estimate still need  ~50 hours beam time to finish 1100 PbWO4 modules.


---

This is a plain text email for clients that cannot display HTML.  The full logentry can be found online at https://logbooks.jlab.org/entry/3405848
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/prad/attachments/20160522/4d42192c/attachment.html>


More information about the PRad mailing list