[PRad] [New Logentry] Follow-up Re: Data analysis on May 23 and work plan on May 24
cpeng at jlab.org
cpeng at jlab.org
Tue May 24 12:25:02 EDT 2016
Logentry Text:
--
The replacement of ADC1881M at crate 6 slot 19 also has a dead channel, so we have to get another board.
We replaced the ADC board for these special channels (dynode sum, lms and scintillator) with the one that was at crate 6 slot 19.
Currently we only use channel 0 - 5, and these channels were proven working on this ADC board.
We have checked the linear fan-in fan-out modules for dynode sum and two scintillators. The NIM modules have some bad channels, now we plug them in channels that are currently working. We may need one good quad linear fan-in fan-out module to replace the problematic ones.
---
This is a plain text email for clients that cannot display HTML. The full logentry can be found online at https://logbooks.jlab.org/entry/3406179
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/prad/attachments/20160524/d72455c2/attachment.html>
More information about the PRad
mailing list