Greetings All,
Yes, the electronics in 4)c) caught my eye,,
I believe we can accommodate readout for a third GEM, but a decision sooner than later will be very helpful.
Regarding the veto detectors, and I can review the collaboration slides, how many channels will be required for these signals?
Expanding the veto discussion with regards to a 'trigger' is something that we [DAQ] need to capture on the trigger requirement list.
There was mention also about running the DAQ for PRADII in streaming mode, where all channels are readout out in a continuous fashion
based on a fixed synchronous time window. The Streaming ReadOut topic would require further discussion/decisions, and we can add this to
a near future meeting or in a WG focus discussion.
Regards,
-Chris
~~~~~~~~~~~~~~
________________________________
From: PRad <prad-bounces at jlab.org> on behalf of gasparan via PRad <prad at jlab.org>
Sent: Wednesday, November 20, 2024 11:51
To: Dutta, Dipangkar <dd285 at msstate.edu>
Cc: PRad mail group <prad at jlab.org>
Subject: Re: [PRad] [EXTERNAL] Re: Fwd: Re: Beamline Configuration Drawings for PRAD II, X17 and TFF
Hi Dipangkar,
Yes, I forgot to list this item too, thanks.
4) the GEM efficiency high accuracy measurement using the so-called
third GEM.
As we discussed on Monday, this item is not fully clear to me. My
question
was, and still is, what is the accuracy of these measurements using
the GEM1,
GEM2 and HyCal (plus the target vertex, we even have 12C foil in the
target cell)?
Nilanga, Weizhi, Chao and who wants to contribute in this part,
please come up
with your arguments on this part.
My approach is that if we even will end up needing the third GEM
then there are
several open item on this way: (a) the size of the third GEM; (b) we
still will
need to attach and survey it better than 1 mm (better than HyCal is
providing it);
(c) the electronics ...
Please prepare for the Friday's discussion.
Ashot
On 2024-11-20 11:17, Dutta, Dipangkar wrote:
> Hi Ashot,
>
> One more item is the GEM support structure ( 2 GEM planes vs 3 GEM
> planes). I believe it should be possible to hold procurement just for
> this item until a final decision is made. Also, we may have to wait to
> finalize this part until all GEM parts have been procured.
>
> Cheers
>
> Dipangkar
>
> From: PRad <prad-bounces at jlab.org> on behalf of gasparan via PRad
> <prad at jlab.org>
> Date: Wednesday, November 20, 2024 at 10:04 AM
> To: PRad mail group <prad at jlab.org>
> Subject: [PRad] Fwd: Re: Beamline Configuration Drawings for PRAD II,
> X17 and TFF
>
> Hi All,
>
> As you see Bob wants to fix the engineering drawings for the
> experiments. We are
> equally interested in finalizing this part to start the procurement
> and
> construction
> phase.
>
> There are few items still not finalized on this part, let us try to
> work on them before
> this Friday meeting, discuss them there and answer to Bob.
>
> 1) veto scintillators thickness: we are testing them now but, it
> will
> take another week
> if not more. I will contact Youri to see if this is important for
>
> the engineering design
> part.
> 2) Veto scintillator attachment tolerance: we are working on this
> item
> but, it will need
> again a week or so. I will contact with Youri and Dipangkar to
> see
> if a 0.5 mm tolerance
> is realistic (for both edges of a single scintilator). In all
> cases
> we need survey ponts
> on this device.
> Weizhi, please make this item a priority before the weekend. If
> we
> need one more meeting,
> I am ready for that.
> 3) Changing the vacuum window from X17 to PRad_II experiments (as it
>
> was shown by Bob).
> This is highly undesirable since it will involve not only the
> vacuum
> part (that comes
> from the target change also) but, it will require a new survey of
>
> the HyCal.
> If we decide to run PRad-II with the new (smaller) window, then
> the
> Pb-glass part of the
> HyCal no longer in use (if even it is ready).
> Weizhi and Chao, please take one more look on this part to before
>
> the weekend.
>
> 4) What else is there to be discussed???
>
> Thanks,
> Ashot
>
> -------- Original Message --------
> Subject: Re: [PRad] Beamline Configuration Drawings for PRAD II, X17
> and
> TFF
> Date: 2024-11-20 08:17
> From: Bob Miller via PRad <prad at jlab.org>
> To: Eugene Pasyuk <pasyuk at jlab.org>, "prad at jlab.org" <prad at jlab.org>,
> "pi0tff at jlab.org" <pi0tff at jlab.org>
> Cc: Christopher Guthrie <guthrie at jlab.org>
> Reply-To: Bob Miller <rmiller at jlab.org>
>
> Good Morning All,
>
> Are there any comments on the layout of PRad II and X17, or do we
> assume the design is fixed and we can finalize the drawings and
> prepare
> to order parts?
>
> Thanks,
>
> Bob Miller
> Hall B Lead Engineer
> (757) 822-9586
>
> -------------------------
>
> From: Eugene Pasyuk <pasyuk at jlab.org>
> Sent: Thursday, October 31, 2024 3:33 PM
> To: prad at jlab.org <prad at jlab.org>; pi0tff at jlab.org <pi0tff at jlab.org>
> Cc: Bob Miller <rmiller at jlab.org>; Christopher Guthrie
> <guthrie at jlab.org>
> Subject: Fw: Beamline Configuration Drawings for PRAD II, X17 and TFF
>
> Here are the beamline drawings for PRad/X17/TFF.
> Please review and give your feedback by November 15th.
>
> -Eugene
>
> -------------------------
>
> From: Christopher Guthrie <guthrie at jlab.org>
> Sent: Thursday, October 31, 2024 14:47
> To: Eugene Pasyuk <pasyuk at jlab.org>
> Cc: Bob Miller <rmiller at jlab.org>
> Subject: Beamline Configuration Drawings for PRAD II, X17 and TFF
>
> Eugene,
>
> I have attached .pdf’s of the Preliminary versions
> PRAD II, X17 and TFF Beamline Configuration Drawings. Can you please
> send these out to the individual run groups and request comments by
> November 15th?
>
> Regards,
>
> Chris Guthrie
>
> Hall B Senior Mech. Designer
>
> (757) 269-6922
> _______________________________________________
> PRad mailing list
> PRad at jlab.org
> https://mailman.jlab.org/mailman/listinfo/prad
> _______________________________________________
> PRad mailing list
> PRad at jlab.org
> https://mailman.jlab.org/mailman/listinfo/prad
_______________________________________________
PRad mailing list
PRad at jlab.org
https://mailman.jlab.org/mailman/listinfo/prad
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/prad/attachments/20241120/a7981a3b/attachment-0001.html>
More information about the PRad
mailing list