[Primex] MC results for the PrimEx-II beam line
David Kashy
kashy at jlab.org
Mon Aug 2 08:46:39 EDT 2010
Hi Ashot,
The report looks good. I wonder why you say 0.8" is the smallest
collimator you can have.
Our normal clean up collimator is 14mm (0.55"). A 2 inch thick lead
block is 9RL and can be drilled much smaller than 0.8"
We can get some free space by moving that collimator to just upstream of
the vacuum box (target).
We will start some layouts and show you soon.
Dave
Ashot Gasparian wrote:
>
> Dear Colleagues,
>
> The fist stage of the MC simulations for the PrimEx-II beam line
> optimization is accomplished. The results are summarized in the
> attached *.ppt presenntation. It is also copied in my public
> directory:
>
> ~gasparan/public_html/PrimEx-II_beamline_MC.ppt
>
> Pawel is also in process of comming up with his simulations soon.
> That would be better for the comparison before making the final
> decision.
>
> Please take a look to this presentation, it is tried to include
> as much information as it is possible before making a summary.
>
> Send me your comments, suggestions or questions.
> The plan is to discuss it in Tuesday's 1:3 pm PrimEx group meeting
> and make a decision for the PrimEx-II beam line.
>
> Thank you,
> Ashot
>
>
> .............................................................
> Ashot Gasparian Phone:(336)285-2112 (NC A&T)
> Professor of Physics
> Physics Department (757)-269-7914 JLab
> NC A&T State University Fax:(757)-269-6273 JLab
> Greensboro, NC 27411 email: gasparan at jlab.org
> .............................................................
More information about the Primex
mailing list