Hi, Matt,
Do you know if FCAL position has been changed since 2015 survey?
Liping
From: GlueX-Collaboration <gluex-collaboration-bounces at jlab.org> On Behalf Of Simon Taylor
Sent: Thursday, February 28, 2019 3:23 PM
To: Ilya Larin <ilarin at jlab.org>; Shepherd, Matthew <mashephe at indiana.edu>; Ashot Gasparian <gasparan at jlab.org>
Cc: primexd at jlab.org; andrsmit at jlab.org; GlueX Collaboration <gluex-collaboration at jlab.org>; Mark Stevens <stevensm at jlab.org>
Subject: Re: [GlueX] Target installation plan
For what it's worth, according to the 2015 survey (I am not sure if the FCAL was resurveyed at a later date), the FCAL as a whole is off in x by about +5mm, but only a tiny amount off from zero in y.
In the attachment the highlighted numbers are z,x,y in meters.
Simon
________________________________
From: GlueX-Collaboration <gluex-collaboration-bounces at jlab.org<mailto:gluex-collaboration-bounces at jlab.org>> on behalf of Ilya Larin <ilarin at jlab.org<mailto:ilarin at jlab.org>>
Sent: Thursday, February 28, 2019 2:58:38 PM
To: Shepherd, Matthew; Ashot Gasparian
Cc: primexd at jlab.org<mailto:primexd at jlab.org>; andrsmit at jlab.org<mailto:andrsmit at jlab.org>; GlueX Collaboration; Mark Stevens
Subject: Re: [GlueX] Target installation plan
Hi Matt,
according to the pictures the square pipe is asymmetrical vs beam line
and is most likely causing the "shade" on ComCal face.
Wondering if FCAL is placed symmetrically vs beam,
that should mean that pipe doesn't exactly match FCAL hole.
The exact values from drawings would help and needed for MC
geometry db to get an exact acceptance.
If it is the case, that only mean we have to reduce ComCal
fiducial region for Compton events.
Thanks for pictures.
Ilya
________________________________
От: GlueX-Collaboration <gluex-collaboration-bounces at jlab.org<mailto:gluex-collaboration-bounces at jlab.org>> от имени Shepherd, Matthew <mashephe at indiana.edu<mailto:mashephe at indiana.edu>>
Отправлено: 28 февраля 2019 г. 12:49
Кому: Ashot Gasparian
Копия: primexd at jlab.org<mailto:primexd at jlab.org>; andrsmit at jlab.org<mailto:andrsmit at jlab.org>; GlueX Collaboration; Mark Stevens
Тема: Re: [GlueX] Target installation plan
Hi Ashot,
> On Feb 28, 2019, at 11:58 AM, gasparan at jlab.org<mailto:gasparan at jlab.org> wrote:
> Therefore, it would be extremely important to take pictures of the FCAL
> insertion part and post on some place to see, before our meeting this
> evening.
I've posted pictures of the FCAL insert here:
https://logbooks.jlab.org/entry/3661206<https://na01.safelinks.protection.outlook.com/?url=https%3A%2F%2Flogbooks.jlab.org%2Fentry%2F3661206&data=02%7C01%7Cprimexd%40jlab.org%7Ce57a146ca16844a0e98c08d69dbc3b4f%7Cb4d7ee1f4fb34f0690372b5b522042ab%7C1%7C0%7C636869829109259174&sdata=2KXLE4iTAxdbN50XnHe3ANfIcjcJTrE5DA6R2QthS40%3D&reserved=0>
It looked today exactly as it did 5+ years ago when these were taken. (I'm surprised you haven't taken a peek at it before as it defines the acceptance of your detector.)
The Plexiglas monitoring system is held in the groove on the upstream end. Anything of any density should be clear of the inner opening in the tube. From the darkroom all that is visible is what appears to be a thin tedlar cover on the upstream end. It is needed for a light seal or else there is light path from the hall into the darkroom via the beam pipe.
Matt
---------------------------------------------------------------------
Matthew Shepherd, Professor
Department of Physics, Indiana University, Swain West 265
727 East Third Street, Bloomington, IN 47405
Office Phone: +1 812 856 5808
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/primexd/attachments/20190228/d564d91b/attachment-0002.html>
More information about the Primexd
mailing list