<!DOCTYPE html PUBLIC "-//W3C//DTD HTML 4.01 Transitional//EN">
<html>
<head>
</head>
<body bgcolor="#ffffff" text="#000000">
HCO in Hall A is close to complete. According to my knowledge the
following items remain open.<br>
<ul>
  <li>There is still some vacuum/valve work that needs to be done from
the shield wall into the Hall that will be checked once the beamline is
ready. </li>
  <li>Work is also being performed on the high power dump.</li>
  <li>Troubleshooting is being performed on the energy mapping system.</li>
  <li>FSD systems checks are on-going (about 80% complete). </li>
  <li>Once the Hall is locked up we can check out the power supplies
for the magnet string and Moeller Quads (scheduled for Monday). </li>
</ul>
<br>
RECO<br>
</body>
</html>