[Rgc] [New Logentry] RC Daily Summary August 23, 2022
Silvia Niccolai
silvia at jlab.org
Wed Aug 24 13:44:13 EDT 2022
Hello,
Will there be an RC meeting today?
2:15pm?
Regards,
Silvia
Sent from my iPhone
> On 24 Aug 2022, at 14:50, avakian at jlab.org wrote:
>
>
> RC Daily Summary August 23, 2022
>
> Edit
> Delete
> Lognumber 4033227. Submitted by avakian on Wed, 08/24/2022 - 08:47.
> Logbooks: HBLOG ELOG
> Entry Makers: avakian
> 8/23 (Tue) 5-Pass Beam on NH3 Target (~50% polarization from NMR)
> Smooth, steady running, with overall ABU 17.6h, BANU 0.7h Total number of events accumulated ~300M
> Most downtime was due to DAQ issues, mainly triggered, by detector trips.
> Changing HWP to IN during the swing shift (Run#16761).
> Traget polarization was dropping faster than usual, and we will need a new anneal today.
>
> 8/24 Plans for the Day shift: As coordinated by James, the RadCon will be in Hall-B 10:30 (controlled access), we will do annealing of the target ~11:00, then do a harp scan and a Moller run, then continue with 4nA on NH3, when beam is back.
>
> _______________________________________________
> Rgc mailing list
> Rgc at jlab.org
> https://mailman.jlab.org/mailman/listinfo/rgc
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/rgc/attachments/20220824/e580947c/attachment.html>
More information about the Rgc
mailing list