[Rgc] [Revised Logentry] RC Daily Summary June 30, 2022
bueltman at jlab.org
bueltman at jlab.org
Thu Jun 30 09:45:02 EDT 2022
Logentry Text:
--
Wednesday afternoon, the target insert was re-installed and the NMR tested successfully with crystals (https://logbooks.jlab.org/entry/4008873).
There are now two coaxial cables connected to the deuteron coils, the "new" cold NMR circuit and a lambda-half cable section for the "old-"style NMR.
Chris started the cool down during the night and the target was cold in the morning (https://logbooks.jlab.org/entry/4009062).
ND3 will be loaded this morning and the target polarized, testing the deuteron NMR.
The accelerator will be down for repairs at least for the day shift, probably into the evening shift.
We have to decide on the target used going forward at out RC meeting today at 2 PM.
RC Meeting Coordinates:
https://jlab-org.zoomgov.com/j/1608674253?pwd=SFZyYmZLWXJieGtpV2dEdVRiUE...
Meeting ID: 160 867 4253
Passcode: 786506
---
This is a plain text email for clients that cannot display HTML. The full logentry can be found online at https://logbooks.jlab.org/entry/4009082
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/rgc/attachments/20220630/4e02ecb5/attachment.html>
More information about the Rgc
mailing list