[Rgc] [New Logentry] RC Daily Summary
akbar at jlab.org
akbar at jlab.org
Sat Oct 1 09:35:02 EDT 2022
Logentry Text:
--
Summary from Friday - Day (9/30/2022) to Saturday - Owl (10/1/2022)
No beam during these time. Around midnight MCC and PD informed us that the engineer will continue the work at 8.00 am this morning. So, the Owl shift was cancelled, the tagger was degaussed, torus and solenoid ramped down. Currently (9.30 am) there is no estimation about when the beam will On, but PD will inform us about the time estimation at around 10.30 this morning.
Issue:
There was no major issue, just an alarm on MVT asking to reset BMT gas flow and 2 MVT interlocks. Resetting BMT gas flow and interlocks fixed the problem. Apparently there was back pressure from high wind: https://logbooks.jlab.org/entry/4049195
Plan:
Send the beam to tagger, do beam-quality check (Harp scan) and then take production run on CH2 after we get the beam.
Zulkaida
---
This is a plain text email for clients that cannot display HTML. The full logentry can be found online at https://logbooks.jlab.org/entry/4049276
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/rgc/attachments/20221001/d76917f8/attachment.html>
More information about the Rgc
mailing list