[Rgc] [New Logentry] Daily RC Summary

hattawy at jlab.org hattawy at jlab.org
Thu Mar 16 08:50:01 EDT 2023


Logentry Text:
--
Daily RC summary for the period from March 15, day shift - till - March 16 Owl shift. 

March 15th, day shift: 
- work summary: Beam went down at 9:00 AM for beam studies. Target got changed from NH3 to ND3 positive polarization. uRWELL work got done.
- Issues:  Eugene has reported on the FTCal gas flow vs. Chiller pressure. https://logbooks.jlab.org/entry/4150011
Data summary: no data were taken   

March 15th, swing shift: 
-Work summary: beam came back at 16:30. Harp scans looked good. Took a Moller Run (82% pol). Started taking data with HWP IN and positive polarized ND3 (47%). 
- Issues: DAQ issue with mvt2 crate, Sergei went down in the hall to reboot the crate. Total DAQ issue dow time about 2 hours. 
Data summary: 66M triggers. ABUs: 3.3 hours, BANUs: 2.1 hours, BNA: 2.5 hours

March 16th, owl shift: 
- Work Summary: continued taking data with HWP IN and about +44% polarization of ND3.  
- Issues: 2 hours of down time for an issue with EES DC power issue at NL01B01 (https://logbooks.jlab.org/entry/4150421)
Data Summary: 144M trigger. ABUs: 4.1 hours, BANUs: 9 minutes  BNAs: 3.7 hours


Plan for the next 24 hours: 
- Will flip the HWP later in the swing shift. Bill Henry from  Hall A has offered to help us optimizing the beam charge asymmetries when we change the HWP. We will call him and he will stop by to run his code for a minute. 
- uRWELL folks may need a rapid controlled access to the hall for 10-20 minutes to fixe a loose connector issue (not confirmed 100%). 
 


---

This is a plain text email for clients that cannot display HTML.  The full logentry can be found online at https://logbooks.jlab.org/entry/4150516
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/rgc/attachments/20230316/f31625ab/attachment.html>


More information about the Rgc mailing list