<html>
<head>
<meta http-equiv="Content-Type" content="text/html; charset=Windows-1252">
<style type="text/css" style="display:none;"> P {margin-top:0;margin-bottom:0;} </style>
</head>
<body dir="ltr">
<div class="elementToProof" style="font-family: Aptos, Aptos_EmbeddedFont, Aptos_MSFontService, Calibri, Helvetica, sans-serif; font-size: 12pt; color: rgb(0, 0, 0);">
For me the only constraint may be that I have a review September 19. But September 20, 26, 27 seems doable.</div>
<div class="elementToProof" style="font-family: Aptos, Aptos_EmbeddedFont, Aptos_MSFontService, Calibri, Helvetica, sans-serif; font-size: 12pt; color: rgb(0, 0, 0);">
<br>
</div>
<div class="elementToProof" style="font-family: Aptos, Aptos_EmbeddedFont, Aptos_MSFontService, Calibri, Helvetica, sans-serif; font-size: 12pt; color: rgb(0, 0, 0);">
On the agenda, it seems to me it is more logical to have the run plan later as it may lead to discussion. And we may want to talk about some mundane tasks, like setting up the documentation (COO, etc.), the shift schedule, etc.</div>
<div class="elementToProof" style="font-family: Aptos, Aptos_EmbeddedFont, Aptos_MSFontService, Calibri, Helvetica, sans-serif; font-size: 12pt; color: rgb(0, 0, 0);">
<br>
</div>
<div class="elementToProof" style="font-family: Aptos, Aptos_EmbeddedFont, Aptos_MSFontService, Calibri, Helvetica, sans-serif; font-size: 12pt; color: rgb(0, 0, 0);">
Best regards,   Rolf</div>
<div id="appendonsend"></div>
<div style="font-family: Aptos, Aptos_EmbeddedFont, Aptos_MSFontService, Calibri, Helvetica, sans-serif; font-size: 12pt; color: rgb(0, 0, 0);">
<br>
</div>
<hr style="display: inline-block; width: 98%;">
<div id="divRplyFwdMsg" dir="ltr"><span style="font-family: Calibri, sans-serif; font-size: 11pt; color: rgb(0, 0, 0);"><b>From:</b> Rsidis-mgmt <rsidis-mgmt-bounces@jlab.org> on behalf of Peter Bosted <bosted@jlab.org><br>
<b>Sent:</b> Tuesday, August 27, 2024 10:29 PM<br>
<b>To:</b> Edward R Kinney <edward.kinney@colorado.edu><br>
<b>Cc:</b> rsidis-mgmt@jlab.org <rsidis-mgmt@jlab.org><br>
<b>Subject:</b> Re: [Rsidis-mgmt] [EXTERNAL] R-SIDIS Collaboration Meeting Dates</span>
<div> </div>
</div>
<div style="font-size: 11pt;">Hi Ed,<br>
    Any of those 4 days is ok with me.<br>
    At last week's meeting, several folks thought that maybe a lognish<br>
half-day meeting would be long enough (like 10-noon, then 1-3)?<br>
    Yours, Peter<br>
<br>
<br>
Prof. Peter Bosted<br>
email: bosted@jlab.org<br>
phone: (808) 315-1297 (cell)<br>
P.O. Box 6254, Ocean View, HI 96737<br>
<br>
On Tue, 27 Aug 2024, Edward R Kinney wrote:<br>
<br>
><br>
> Hi Folks,<br>
><br>
>  <br>
><br>
> Sorry for the delay in this; I would like to get a little feedback on the<br>
> meeting. I made up a strawman agenda below, which looks to me like about a 1<br>
> day meeting. Please feel free to comment!<br>
><br>
>  <br>
><br>
> I was think that either a Thursday or Friday would work best. I know there is<br>
> an ePIC meeting around Sept 13, but I don’t know about others. So how about<br>
> Sept 19, 20, 26, or 27? Let me know of any preferences or conflicts!<br>
><br>
>  <br>
><br>
> Thanks,<br>
><br>
> Ed<br>
><br>
>  <br>
><br>
> Draft Agenda (random order at present)<br>
><br>
>  <br>
><br>
> Welcome<br>
><br>
> Run Plan Presentation and Discussion (including systematic checks)<br>
><br>
> Physics of R Measurements<br>
><br>
> Hall C Equipment Status (Target, Spectrometers)<br>
><br>
> DAQ Setup/Status<br>
><br>
> LAD->R-SIDIS transition<br>
><br>
> Online Analysis Setup/Status<br>
><br>
> Manpower/task planning<br>
><br>
>  <br>
><br>
>  <br>
><br>
><br>
></div>
<div id="appendonsend"></div>
<div style="font-family: Aptos, Aptos_EmbeddedFont, Aptos_MSFontService, Calibri, Helvetica, sans-serif; font-size: 12pt; color: rgb(0, 0, 0);">
<br>
</div>
<hr style="display: inline-block; width: 98%;">
<div id="divRplyFwdMsg" dir="ltr"><span style="font-family: Calibri, sans-serif; font-size: 11pt; color: rgb(0, 0, 0);"><b>From:</b> Rsidis-mgmt <rsidis-mgmt-bounces@jlab.org> on behalf of Peter Bosted <bosted@jlab.org><br>
<b>Sent:</b> Tuesday, August 27, 2024 10:29 PM<br>
<b>To:</b> Edward R Kinney <edward.kinney@colorado.edu><br>
<b>Cc:</b> rsidis-mgmt@jlab.org <rsidis-mgmt@jlab.org><br>
<b>Subject:</b> Re: [Rsidis-mgmt] [EXTERNAL] R-SIDIS Collaboration Meeting Dates</span>
<div> </div>
</div>
<div style="font-size: 11pt;">Hi Ed,<br>
    Any of those 4 days is ok with me.<br>
    At last week's meeting, several folks thought that maybe a lognish<br>
half-day meeting would be long enough (like 10-noon, then 1-3)?<br>
    Yours, Peter<br>
<br>
<br>
Prof. Peter Bosted<br>
email: bosted@jlab.org<br>
phone: (808) 315-1297 (cell)<br>
P.O. Box 6254, Ocean View, HI 96737<br>
<br>
On Tue, 27 Aug 2024, Edward R Kinney wrote:<br>
<br>
><br>
> Hi Folks,<br>
><br>
>  <br>
><br>
> Sorry for the delay in this; I would like to get a little feedback on the<br>
> meeting. I made up a strawman agenda below, which looks to me like about a 1<br>
> day meeting. Please feel free to comment!<br>
><br>
>  <br>
><br>
> I was think that either a Thursday or Friday would work best. I know there is<br>
> an ePIC meeting around Sept 13, but I don’t know about others. So how about<br>
> Sept 19, 20, 26, or 27? Let me know of any preferences or conflicts!<br>
><br>
>  <br>
><br>
> Thanks,<br>
><br>
> Ed<br>
><br>
>  <br>
><br>
> Draft Agenda (random order at present)<br>
><br>
>  <br>
><br>
> Welcome<br>
><br>
> Run Plan Presentation and Discussion (including systematic checks)<br>
><br>
> Physics of R Measurements<br>
><br>
> Hall C Equipment Status (Target, Spectrometers)<br>
><br>
> DAQ Setup/Status<br>
><br>
> LAD->R-SIDIS transition<br>
><br>
> Online Analysis Setup/Status<br>
><br>
> Manpower/task planning<br>
><br>
>  <br>
><br>
>  <br>
><br>
><br>
></div>
</body>
</html>