[Sbs] [New Logentry] Hall A RC report -Nov 17
chandan at jlab.org
chandan at jlab.org
Fri Nov 17 10:10:02 EST 2023
Logentry Text:
--
<br>
<br>
Here are some notable things/issues that have happened since yesterday:
<br>
<br>
<ul>
<li>Unfortunately, we didn't get authorization for the CW beam in Hall A yesterday swing - <a href
="https://logbooks.jlab.org/entry/4221533"> Beam Authorization </a> </li>
<li>Even if we had beam authorization, there would not have been any beam in the hall overnight due to the 2L22 cryomodule issue - <a href
="https://logbooks.jlab.org/entry/4221643"> 2L22 Cryomodule issue </a> </li>
<li>The SL for the last Swing and Owl shift were canceled. Today's Day's SL is in standby mode. TO reported since the last swing - the magnets and target LASER were on. Thanks to Jimmy, Eric, and Jackson for signing up for the shift on short notice.</li>
<li> Kate took cosmic runs with magnets on and produced HVs for production - <a href ="https://logbooks.jlab.org/entry/4221624"> Production HV settings </a> </li>
<li> One hodoscope HV channel tripped -<a href ="https://logbooks.jlab.org/entry/4221632"> (halog entry from Jimmy) </a> Gary is looking into it</li>
<li> Bill Henry performed a preliminary EPR calibration- <a href ="https://logbooks.jlab.org/entry/4221721"> EPR from Bill </a> </li>
<li> A further look on EPR calibration by Jackson- <a href ="https://logbooks.jlab.org/entry/4221724"> EPR from Jackson </a> </li>
<li> Hunter is at the CH to perform the FINAL EPR calibration </li>
</ul>
<br>
There are a couple of hours for work to pump ~180 gal of water from the swamp area in building 91 to a storage tank.
After that, we most likely get the Beam authorization in the hall.
<br>
Hopefully, by then the 2L22 cryomodule work will be complete.
<br>
We projected to start at some time in the swing at the earliest.
<ul>
<li> The run plan from the spokesperson is attached. </li>
<li> Hall C is planning to perform a Moller measurement either Saturday or Monday. MCC doesn't prefer simultaneous Moller measurements in Hall A and C. So, we have to plan accordingly for the Moller measurement.</li>
<li> Yesterday, I contacted Ellen regarding whether BB magnet polarity can be changed remotely or not - her answer was NO. So, we should plan accordingly when to change polarity. </li>
</ul>
Thanks to all the people who signed up for the shifts on short notice.
<br>
There are still a couple of open slots. Please consider signing up for those open slots.
<br>
<a href="https://misportal.jlab.org/mis/apps/physics/shiftSchedule/index.cfm?experimentRunId=SBS-GEn-2022"> Shift Sign-up page </a>
<br>
We will have a regular RC meeting at 3:30 pm today in the CH conference room.
<br>
People can join remotely via:
<br>
https://jlab-org.zoomgov.com/j/1616220064
<br>
Meeting ID: 161 622 0064
<br>
Passcode: 314159
<br/>
---
This is a plain text email for clients that cannot display HTML. The full logentry can be found online at https://logbooks.jlab.org/entry/4221766
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/sbs/attachments/20231117/e0c5d19c/attachment.html>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: application-pdf.png
Type: image/png
Size: 346 bytes
Desc: not available
URL: <https://mailman.jlab.org/pipermail/sbs/attachments/20231117/e0c5d19c/attachment.png>
More information about the Sbs
mailing list