FYI - CM-03 is cold. CM-04 is awaiting controls hardware before it will be cooled down in case you were wondering. -Ed<br>
</div>
<div id="appendonsend"></div>
<hr style="display:inline-block;width:98%" tabindex="-1">
<div id="divRplyFwdMsg" dir="ltr"><font face="Calibri, sans-serif" style="font-size:11pt" color="#000000"><b>From:</b> Galambos, John D. <galambosjd@ornl.gov><br>
<b>Sent:</b> Friday, April 21, 2023 1:16 PM<br>
<b>To:</b> Andersen, Ken <andersenkh@ornl.gov>; Cain, Wendy <cainwa@ornl.gov>; Ed Daly <edaly@jlab.org><br>
<b>Subject:</b> [EXTERNAL] PPU weekly update</font>
<div> </div>
</div>
<style>
<!--
@font-face
{font-family:"Cambria Math"}
@font-face
{font-family:Calibri}
p.x_MsoNormal, li.x_MsoNormal, div.x_MsoNormal
{margin:0in;
font-size:11.0pt;
font-family:"Calibri",sans-serif}
span.x_EmailStyle17
{font-family:"Calibri",sans-serif;
color:windowtext}
.x_MsoChpDefault
{font-family:"Calibri",sans-serif}
@page WordSection1
{margin:1.0in 1.0in 1.0in 1.0in}
div.x_WordSection1
{}
-->
</style>
<div lang="EN-US" link="#0563C1" vlink="#954F72" style="word-wrap:break-word">
<div class="x_WordSection1">
<p class="x_MsoNormal">In the PPU superconducting RF area, the 3<sup>rd</sup> new cryomodule installed in the tunnel began cooldown this week. Also the return end can for cryomodule 7 passed inspection at the vendor and will be shipped to the partner JLab next
week. In the RF area, high power testing continues for the equipment needed for the upcoming phase 2 run. In the Ring area the first two (of three) new magnets needed for installation in the long outage were crated at our partner FNAL, in preparation for shipment
to SNS next week. In the target area, vendor progress continues on equipment needed for the long outage, e.g. with the lead shielding poured for the molecular sieve bed equipment. Finally the RTBT stub contract award is in ORNL contract compliance office and
will go to the DOE site office for approval next week. </p>
<p class="x_MsoNormal"> </p>
<p class="x_MsoNormal"> </p>
<div>
<div>
<p class="x_MsoNormal"><span style="">John Galambos</span></p>
<p class="x_MsoNormal"><span style="">Proton Power Upgrade Project Director</span></p>
<p class="x_MsoNormal"><span style="">Mobile: 865-228-1531 office: 865-576-5482</span></p>
<p class="x_MsoNormal"><span style=""> </span></p>
<p class="x_MsoNormal"><span style=""> </span></p>
</div>
</div>
<p class="x_MsoNormal"> </p>
</div>
</div>
</body>
</html>