Here is a more detailed agenda:
2023/2/2 meeting
Run update:
1. access Wed 2/1/23 – all
Findings:
1. Darren: CerSum with high-ShowerSum cut in TS4, with and without coincidence;
2. Xiaochao: followup on TS1, CerSum (300mV) threshold is at channel ~3000. If spe is at 150, we want to set threshold at 300 for e-trig or 30mV
3. Jixie: fixed L/R swap between level 0 and level1 trees. This happened to both preshower and shower. Recooked all data.
4. MIP in Shower, anyone?
Summary of MIP positions:
• SC-A: ~ 500 (Darren Summary plot)
• SC-C: ~150-200-ish
• SC-D: ~500 (Darren Summary plot and Ye plot, threshold in TS2 with 10mV is at 800)
• SC-B: ~500 to 600 (Ye plot shows simulated MIP Edep=2MeV for high-energy electrons as well as pions see IMG_6060.png, and high-energy electron in data shows the peak at 500-600-ish, see HallC_data_run4094_SCB.pdf; TS2 is triggering almost right at MIP and threshold needs to be halved.) (Darren plot also shows TS2 and TS5 threshold at ~500)
• Preshower: visible and okay for now
• Shower: To be found
• LASPD: visible and okay for now
Runplan:
HV change:
• Shower HV change: per Jimmy et al.
threshold change:
1. TS1: CerSum from 300mV to 30mV; ShowerSum TBD;
2. TS2: SC-D from 10mV to 5mV; SC-B from 10mV to 5mV; ShowerSum at 5mV or at half MIP (if identified);
3. TS3: SC-D from 10mV to 5mV; ShowerSum at 5mV or at half MIP; CerSum to 30mV
4. TS4: trigger threshold (?700mV) too low. Please adjust ShowerSum threshold, set PS=0 and take data at <4kHz rate. Note that due to HV change, thresholds need re-evaluated, 700mV as a starting point is reasonable.
5. TS5: SC-B from 10mV to 5mV
Runs to take:
• TS4 only
• TS2 only
• all TS
Propose new trigger setup for high-rate
– Xiaochao
________________________________________
From: Solid_ec <solid_ec-bounces at jlab.org> on behalf of Xiaochao Zheng via Solid_ec <solid_ec at jlab.org>
Sent: Wednesday, February 1, 2023 5:25 PM
To: solid ec
Subject: [Solid_ec] SoLID ECal meeting 9am Feb. 2nd
Dear All:
We will hold our next EC meeting tomorrow, Feb. 2nd.
We will focus on:
-- beam test status update: calibration, threshold setting, GEM install
-- run plan for next set of data taking and analysis
-- discussion of trigger setup for now and 20 deg test
Zoom link:
https://jlab-org.zoomgov.com/j/1617292018?pwd=bkYzZFZMU1FDUXFMTUNzTkpFVkdNdz09
Thanks,
Xiaochao
_______________________________________________
Solid_ec mailing list
Solid_ec at jlab.org
https://mailman.jlab.org/mailman/listinfo/solid_ec
More information about the Solid_ec
mailing list