[Solid_ec] SoLID ECal meeting 9am Feb. 2nd

Xiaochao Zheng xiaochao at jlab.org
Wed Feb 1 22:16:16 EST 2023


Here is a more detailed agenda:

2023/2/2 meeting
Run update:
1. access Wed 2/1/23 – all
Findings:
1. Darren: CerSum with high-ShowerSum cut in TS4, with and without coincidence;
2. Xiaochao: followup on TS1, CerSum (300mV) threshold is at channel ~3000. If spe is at 150, we want to set threshold at 300 for e-trig or 30mV
3. Jixie: fixed L/R swap between level 0 and level1 trees. This happened to both preshower and shower. Recooked all data.
4. MIP in Shower, anyone?

Summary of MIP positions:
    • SC-A: ~ 500 (Darren Summary plot)
    • SC-C: ~150-200-ish
    • SC-D: ~500 (Darren Summary plot and Ye plot, threshold in TS2 with 10mV is at 800)
    • SC-B: ~500 to 600 (Ye plot shows simulated MIP Edep=2MeV for high-energy electrons as well as pions see IMG_6060.png, and high-energy electron in data shows the peak at 500-600-ish, see HallC_data_run4094_SCB.pdf; TS2 is triggering almost right at MIP and threshold needs to be halved.) (Darren plot also shows TS2 and TS5 threshold at ~500)
    • Preshower: visible and okay for now
    • Shower: To be found
    • LASPD: visible and okay for now

Runplan:
HV change:
    • Shower HV change: per Jimmy et al.
threshold change:
    1. TS1: CerSum from 300mV to 30mV; ShowerSum TBD;
    2. TS2: SC-D from 10mV to 5mV; SC-B from 10mV to 5mV; ShowerSum at 5mV or at half MIP (if identified);
    3. TS3: SC-D from 10mV to 5mV; ShowerSum at 5mV or at half MIP; CerSum to 30mV
    4. TS4: trigger threshold (?700mV) too low. Please adjust ShowerSum threshold, set PS=0 and take data at <4kHz rate. Note that due to HV change, thresholds need re-evaluated, 700mV as a starting point is reasonable.
    5. TS5: SC-B from 10mV to 5mV
Runs to take:
    • TS4 only
    • TS2 only
    • all TS

Propose new trigger setup for high-rate
 – Xiaochao

________________________________________
From: Solid_ec <solid_ec-bounces at jlab.org> on behalf of Xiaochao Zheng via Solid_ec <solid_ec at jlab.org>
Sent: Wednesday, February 1, 2023 5:25 PM
To: solid ec
Subject: [Solid_ec] SoLID ECal meeting 9am  Feb. 2nd

Dear All:

We will hold our next EC meeting tomorrow, Feb. 2nd.

We will focus on:
-- beam test status update: calibration, threshold setting, GEM install
-- run plan for next set of data taking and analysis
-- discussion of trigger setup for now and 20 deg test

Zoom link:
https://jlab-org.zoomgov.com/j/1617292018?pwd=bkYzZFZMU1FDUXFMTUNzTkpFVkdNdz09

Thanks,

Xiaochao

_______________________________________________
Solid_ec mailing list
Solid_ec at jlab.org
https://mailman.jlab.org/mailman/listinfo/solid_ec



More information about the Solid_ec mailing list