<div dir="ltr"><div><div>We will have the SoLID EC/DAQ meeting on June 25th 2013 10:30 AM. <br><br></div><div>I booked room F226 for people on site.<br></div><div><br>The ready talk number for US is : 1866 740 1260 <br><br>
Pass code is : 1186942 <br><br></div>Send me a copy of your files if you want me to display them.<br><br></div>To see the share log at : <a href="http://www.readytalk.com">www.readytalk.com</a><br><div><div><br>A summary of previous meeting ( all files can be found at : <a href="http://hallaweb.jlab.org/12GeV/SoLID/download/ec/meeting/2013-06-18/">http://hallaweb.jlab.org/12GeV/SoLID/download/ec/meeting/2013-06-18/</a> <br>
----------------------------------------------------------<br>Mike Paolone, Yuxian, JP, Alex, Rakitha,Rich Holmes, Paul Reimer, Zhiwen, Jin, Paul Souder ( arrived at the end ) <br><br>Mike ( Cerenkov update ) <br>Still working on simulation <br>
- most event have 2 PMT, peaks around 3 to 4 <br>- check efficiency on sum of 9 <br>- still need to evaluation of background : <br>contacted Maurizio for improving physics list ( Maurizio out of town ) <br>--optical processes <br>
--only old background processes which work with optical <br>- still need to check base design ( if active might add electronics noise ) <br>still need to be defined <br>-checking background from GEMC at Cerenkov window is consistant with Zhiwen and Seamus <br>
( still discrepancies ) <br>-will discuss with Zhiwen <br>Light Gas Cerenkov : talk DNP <br><br><br>Zhiwen ( Simulation check ) <br>-He is back ! <br>-baffles geometry : need to use new baffles, needs to crosscheck with Seamus <br>
-in contact with Seamus and Mike <br>-back July 11th <br>-response <br><br>Yuxiao <br>-got map calorimeter from Zhiwen and Paul <br><br>Paul Reimer <br>-Question from Zhiwen : drawing of calorimeter, <br>rails outer calorimeter not filled but they are <br>
-12 sections : no fewer because of weight,more possible but increase cost <br><br>Richard Holmes :slides at <a href="http://hallaweb.jlab.org/12GeV/SoLID/download/ec/meeting/2013-06-18/rsholmes_separation_update-June-18th-2013.pdf">http://hallaweb.jlab.org/12GeV/SoLID/download/ec/meeting/2013-06-18/rsholmes_separation_update-June-18th-2013.pdf</a> <br>
Slide 4 <br>Plots of photons origins hitting the GEM <br>Slide 5 <br>iron of inner solenoid shields most of beamline background, most background from target <br>baffles used are baffles 3.9 , latest from svn. Need to get the latest one from Zhiwen <br>
0 width vertex, odd source of electron, all electrons going in 4th gem and in GEM, all momenta <br>space filled with air <br>Slide 8 <br>electron background produced in GEM <br>Odd source in last baffle to be investigated <br>
Paul find informative to generate r vs vz plots and 2D plot <br>though one needs to turn on storage of vertex information <br>Zhiwen will send last version of baffles <br>Conlusion : <br>As before, photons and electrons are localized at <br>
well separated positions in 4th GEM <br>•Much poorer separation at 2nd GEM <br>• Isotropic photon background is small, and can <br>probably be reduced further <br><br>GEM : photon conversion discrepancy with SBS Zhiwen is looking into that <br>
<br><br>Alexandre <br><a href="http://hallaweb.jlab.org/12GeV/SoLID/download/ec/meeting/2013-06-18/SolID-EC-DAQ-June18th-2013.pdf">http://hallaweb.jlab.org/12GeV/SoLID/download/ec/meeting/2013-06-18/SolID-EC-DAQ-June18th-2013.pdf</a> <br>
<a href="http://hallaweb.jlab.org/12GeV/SoLID/download/ec/meeting/2013-06-18/SolID-EC-DAQ-June18th-2013.pptx">http://hallaweb.jlab.org/12GeV/SoLID/download/ec/meeting/2013-06-18/SolID-EC-DAQ-June18th-2013.pptx</a> <br><br>
-Discussed with electronics group for selective FADC readout <br>-Upgrade event type to send FADC to be read out, need to develop FADC readout <br>-Assuming 2 clusters per event this drops data rate to around 60 MB/s per sector : only need one crate <br>
-Cost down to around 3.5 M$ including spares <br>-Need to evaluate cost of L3 <br>--assuming one sector is twice faster than Hall D gives a price of 1.8 M$ with tracking and 0.61 M$ without tracking for 20 KHz trigger rate. Cost scales with rates so up to 5.4 M$ for 60 KHz with tracking. Most likely go without tracking and rates with Cerenkov will be reduced<br>
--need to evaluate strategy and speed of algorithm <br><br>Jin <br>-Question to Zhiwen : when new background simulation will be available ? <br>wait to resolve issues with Seamus <br><br></div></div></div>