<div>Hi All,</div><div><br></div><div>We had a great kick-off meeting yesterday. Thanks to everyone for your participation, particularly to our colleagues in China for overcoming the inconvenient time difference. Also a special big thank you to Yuxiang for setting up ReadyTalk and a Skype group for the meeting.&nbsp;</div><div><br></div><div>So below are the minutes I've just complied of yesterday's meeting:</div><div><br></div><div>X-ray test of a 30*30cm2 GEM prototype at USTC &nbsp;(Wenhao You and Yi Zhou)</div><div>---------------------------------------</div><div>- A short was spotted and fixed on segment 3 of foil 1</div><div>- Multiple 8KeV X-ray scans were performed at different times.</div><div>&nbsp;* Energy resolutiosn look OK generally.</div><div>&nbsp;* Spectrum peaks varied a lot across sectors and with time, and not in a monotonic way in the latter case.</div><div>&nbsp; &nbsp;o) This prototype was stretched completely manually. This may have caused imperfect tension distribution over foils resulting in non-uniform space between foils and eventually producing the nonuniform gains suggested by the spatial variations on X-ray spectrum peak.</div><div>&nbsp; &nbsp;o) Unstable gas condition was suspected of being responsible for the time variations.</div><div>+ Next to do</div><div>&nbsp; * continue the X-ray test and identify the cause of the time variations.</div><div>&nbsp; * improve foild stretching for next prototypes</div><div><br></div><div>GEM progress from Tsinghua (Zhigang Xiao)</div><div>-----------------------------------------</div><div>- Two problems (high trigger rate and very narrow energy spectrum) reported at Huangshan workshop concerning the GEM electronics developed at Tsinghua have been solved by picking up trigger signals from the lowest GEM foil.</div><div>- A readout PCB was designed in collaboration with Duan Limin from IMP. Strips are arranged in the central region, whereas pads are used on the skirts to reduce readout density.</div><div>&nbsp; o) It was commented that this was obviously just a temporary design that can not be adopted in the actul case.</div><div>+ Next to do</div><div>&nbsp; * test the home-made electronics with a large size GEM chamber.</div><div><br></div><div>GEM status at CIAE (Chao Shan and Xiaomei Li)</div><div>--------------------------------------</div><div>- Status of GEM foild production R&amp;D was presented</div><div>- A simulation study of boron coated GEM for neuntron detection was also presented</div><div>- APV25 test still ongoing. Some problems with its DAQ are being debuged.</div><div>&nbsp; o) Gu Chao is currently helping with the test and debugging</div><div>+ Next to do</div><div>&nbsp; * Kapton etching</div><div>&nbsp; * Continue with APV25 test</div><div><br></div><div>GEM progress from LanZhou Univeristy (Xiaodong Wang)</div><div>---------------------------------------</div><div>- finished a prelimenry design of GEM frame for a small GEM prototype (10cm*10cm)</div><div>&nbsp; o) It was suggsted to put gas input and output on two separate sides instead of on the same side as is the case in the current desgin.</div><div>- designed a readout PCB for the prototype.</div><div>&nbsp; o) The feature of distributing strip readout in a much larger area that the actual active area in the current design won't be accepted in the Solid experiement.</div><div>&nbsp; o) A lot of other technical comments also received.</div><div>+ Next to do</div><div>&nbsp; * discuss with Zhouyi and others beyond the meeting for more details on the technical design of the readout PCB.</div><div><br></div><div>Message from Jianping about APV25 chips</div><div>---------------------------------------</div><div>If we need more APV25 chips, we should act now to allow time for getting a new license through approval.</div><div><br></div><div><br></div><div>Jianbei</div><div><br></div><br>