[Tdis] [EXTERNAL] Re: question on C12-15-006
Dipangkar Dutta
d.dutta at msstate.edu
Wed Jul 19 11:04:56 EDT 2023
Dear TDIS collaborators,
Please find attached a draft response to the questions from the PAC
reader on the TDIS jeopardy update.
Please send us your comments and corrections. We hope to submit it by
the end of the day today, or if there are substantial changes by early
tomorrow morning.
Cheers
Dipangkar
On Mon, Jul 17, 2023 at 11:20 AM Dipangkar Dutta <d.dutta at msstate.edu> wrote:
>
> Hi Everybody,
> Here are the questions from the reader. I will start an overleaf
> document and start populating the answers.
> We may need to have a meeting on Wednesday to discuss the answers.
> Cheers
> Dipangkar
>
>
> ---------- Forwarded message ---------
> From: Geralyn Zeller <gzeller at fnal.gov>
> Date: Mon, Jul 17, 2023 at 8:50 AM
> Subject: question on C12-15-006
> To: d.dutta at msstate.edu <d.dutta at msstate.edu>
> Cc: markus.diehl at desy.de <markus.diehl at desy.de>, mcontalb at fe.infn.it
> <mcontalb at fe.infn.it>
>
>
> Dear Dipangkar,
>
>
>
> Thank you for the update to CR-15-006: Measurement of Tagged Deep
> Inelastic Scattering. In preparing for PAC51, we are hoping you and
> your colleagues on TDIS could also kindly respond to the following
> questions:
>
>
>
> How has the TDIS collaboration evolved since this experiment was first
> proposed to today? Have there been any significant changes to the
> number of institutions, staff, or prospective students?
>
>
>
> Could you please say more about the needs and plans for the additional
> 33 days of operations? Specifically:
>
> For the 13 day engineering run, it is understood that the beam
> luminosity will be increased in stages. How many days of running are
> needed at each stage? How will the optimal luminosity be determined?
> For the additional 20 days of running to support pion and kaon SF
> measurements, how was the duration of 20 days arrived at? What
> improvement in physics measurement capability is expected with 20
> additional days of data-taking? Is it possible to couple this
> additional 20 days to a quantitative measure of added physics
> performance?
>
>
>
> The detector redesign and associated prototyping effort that has taken
> place since the experiment was first proposed is both impressive and
> important. What is the approximate expected timeline for obtaining
> results from the two detector prototypes? The first detector prototype
> will take data in Hall A at JLAB and at Fermilab this fall: what about
> the second prototype? When is it expected to be operated and where?
> Could you please comment on roughly when you expect to have results
> from this full complement of detector prototypes?
>
>
>
> We note that the previous PAC commented that the choice of a 4.7 T
> solenoid magnetic field may not be optimal for the lowest momenta
> recoil protons. How has this been addressed? Has the performance for
> low momenta protons in this B field been studied in simulation?
>
>
>
> It is mentioned in the update that new developments in TDIS theory
> since 2015 have resulted in an expected increase in the TDIS signal
> yield. Could you please give a rough sense of how much larger a signal
> rate is expected based on these new developments?
>
>
>
> Thank you for providing links to the white and yellow papers, but is
> it possible to please elaborate on the ~50 new publications that have
> bolstered interest in the TDIS run group of experiments: is it
> possible to provide a list of these publications?
>
>
>
> Thanks and looking forward to your presentation on the 26th,
>
>
>
> Sam Zeller
>
> Senior Scientist
>
> Deputy Project Director for LBNF/DUNE-US Near Detector
>
>
>
> LBNF/DUNE-US Division
>
> Fermi National Accelerator Laboratory
>
> (630) 840-6879 office
-------------- next part --------------
A non-text attachment was scrubbed...
Name: TDIS_Response_to_Reader_2023.pdf
Type: application/pdf
Size: 500990 bytes
Desc: not available
URL: <https://mailman.jlab.org/pipermail/tdis/attachments/20230719/7e382393/attachment-0001.pdf>
More information about the Tdis
mailing list