[Tgun] [New Logentry] T-Gun: Update
mstefani at jlab.org
mstefani at jlab.org
Mon Jul 29 14:55:15 EDT 2019
Logentry Text:
--
The radiation monitors have been installed in the locations that will be used during HV processing. Rad mon 4 & 5 will be moved further down the beam-line after HV Processing to their final location near Viewer 3.
The HV cable has been installed. The cable contact point was changed from the rear of the gun to the top.
The gun enclosure and flow meter has been completed/installed.
A converter from SHV to BNC is being fabricated to connect and control the anode bias. This must be installed before moving forward with HV processing.
---