[Injector Upgrade] AIPINJ - 4/6/21 status
Joe Grames
grames at jlab.org
Tue Apr 6 15:01:09 EDT 2021
The Wien bake ended successfully, leak check and ion pumps look okay. We're cleaning up after the bake, preparing for some selected jobs for the remainder of this week by CIS, INSTALL, SSG.
The long baked magnet leads require some TLC and strain relief post-bakeout Please, do NOT flex/bend magnet leads until this addressed - I have reached out to Jim Coleman to walk the line. Breaking a wire means venting and re-baking the beam line - 2 weeks and many tears.
Going forward, if you plan to work that day then plan for someone to join the daily 8:30 toolbox: => https://bluejeans.com/171126028
Joe