[Bteam] Today's agenda slightly revised
Arne Freyberger
freyberg at jlab.org
Wed Dec 9 09:41:33 EST 2009
B-team Meeting
1 2009-12-09 Wed 14:00 Agenda ATTACH
1.1 Brief Hall Beam Quality Status
Let's keep this short this time?
1.2 Hall-B g9-frost Pasyuk
* Beam Requirements
* Commissioning plans
5 days of commissioning (concurrent with PREX commissioning) are
on the schedule.
1.3 PREX Requirements
Quick review of the PREX requirements which can be found at:
http://hallaweb.jlab.org/parity/prex/PREX_Beam_Requirements.pdf
<#[[http://hallaweb.jlab.org/parity/prex/PREX_Beam_Requirements.pdf>]]
Please read the "Special Considerations" section carefully. We will need
to develop a plan as to how Accelerator is going to address these
requirements and considerations.
1.4 Spring2010 run: Injection Chicane configuration Arne
Should we return to running with some M_56 component in the injection
chicane? Would this hide our sins? Make us less immune to injector
bunching issues? What other implications should be considered?
1.5 Viewer limited BPMs Tief
1.6 Large Synchronous Data (LSD) Effort Michele Arne
An effort to come to terms with the expected large data volume of the 12
GeV era epics system has been started. The RF systems, DDA, BLA systems
will have a large number of waveforms available for analysis. A small
team has been formed to develop requirements and analysis frameworks for
the data.
At present we are also thinking of adding a global event system
<http://www.aps.anl.gov/epics/meetings/2006-06/Timing_Systems/Micro_Research_Timing_Components.ppt>.
So that the epics records can be synchronized.
The team will need help from Bteam on this project. For example:
1. How well should the data be synchronized?
2. Any thoughts on analysis frameworks? Root? R? ScientificPython?
3. Any thoughts on data structure? Root Trees? netCDF?
1.7 Next Week
* Hall-B Dark matter experiment Stepanyan
Stepan will introduce us to a proposal for a dark matter search in
Hall-B that will likely need some optics support.
2 2009-12-02 Wed 14:00 Agenda--Notes
No realtime notes. Lengthy discussion on Hall-B beam quality at
one-pass. Hall-B did not receive any good beam during the
1-pass/transverse setup. Hall-B will have to schedule an additional time
at one-pass.
2.1 Machine Status summary
* Hall-A issues?
* Hall-B issues?
* OPS issues Yan
* Optics-on-Call summary Hofler
2.2 Report from Hall-A collaboration meeting Benesch
Jay will summarize the recent Hall-A collaboration meeting. Issues
raised include:
* ep system removal
* transverse target chicane
* 11 GeV Moller experiment
2009-12-07 Mon 10:53
Did not get to the remain agenda.
2.3 Review. Remaining 6 GeV program
We will go through the remaining 6 GeV program to see. Highlight
"unknowns" and assign people to make the "unknowns" "knowns".
* Hall-A
* Hall-B
* Hall-C
o Nothing but Qweak, but do we really know what they want?
2.4 Next Week
* report from Hall-B on the g9-frost requirements
* Viewer mode shift for BPMs (Tief)
Date: 2009-12-09 09:40:51 EST
HTML generated by org-mode 6.33trans in emacs 23
--
Arne Freyberger
Director Operations Department
Jefferson Lab Phone: (757) 269-6268
12000 Jefferson Avenue Pager: (757) 584-6268
Newport News, VA 23606 Email: freyberg at jlab.org
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/bteam/attachments/20091209/add8aaf4/attachment-0002.html>
More information about the BTeam
mailing list