[Bteam] hall C optics
Jay Benesch
benesch at jlab.org
Wed Nov 10 20:42:54 EST 2010
Geoff Johnston ran multiHarp.
http://opweb.acc.jlab.org/CSUEApps/elog02/elog_item.php?elog_id=1552084
I used Michele's tools to analyze the quad scan twice, backpropagating
to the BPM just before the scanned quad in one case, IPM3C04, and to the
end of the drift before the Lambertson viewer, D7000, in the second.
The Twiss parameters and the matching results are in the B-Team Logbook,
BTLog. Matching took Pelegant's eight processes 22.5 minutes at IPM3C04
and 23.8 minutes at D7000. The quad changes are similar but not
identical. Both matches turned the quadruplet into a doublet by
"turning off" 3C04 and 3C05.
There is a START element in the ele file, of course, but I got bit the
last time I tried to calcEmittance there so I didn't try this time.
The elegant and optim designs are not the same. I haven't determined
the cause. The "now" quad values are the same as those in the Optim
deck I emailed some of you earlier.
Jay
More information about the BTeam
mailing list