[Bteam] Monday Beam Studies

Ron Lauze lauze at jlab.org
Fri May 6 11:07:38 EDT 2011


I would like (really need!) a 1 hour access into the injector to get a 
handle on the injector LCW system. A procedure needs to be developed to 
isolate and flush the injector devices and unfortunately, to the best of 
my knowledge, the majority of the plumbing is not documented .

Ron

On 5/6/2011 11:02 AM, Arne Freyberger wrote:
> The SL21 shaker tests deferred from Thursday will take place on Monday.
> These test require about 8 hours of time and the SL to be in restricted
> access.   This means that there is 8 hours of time available for
> injector studies on Monday.
>
> It also means that the Arc2 optics and Stripline BPM studies will not
> take place on Monday.     Are there other tests out there that people
> want to execute before beam terminates Friday morning?    And how strong
> is the desire/need to perform these tests?
>
> Those tests that are deemed urgent need to be identified, prioritized
> and the proponents ready to execute the tests at anytime between now and
> next Friday.  If the ESR crashes or other opportunities arise, we will
> try to execute these tests to coincide with the halls being down,
> regardless of the time of day.
>
> If you have a beam study you wish to perform before Friday please send
> an email to bteam at jlab.org by noon today. The email should point to the
> ATlis task and have a short note as to why this test needs to be
> performed before the shutdown.   Jay and I (and anyone else) who wants
> participate will prioritize the list at 2pm today in MCC.
>
> Thanks!
> Arne