[Bteam] Thursday is going to be a very full day. Friday won't be much better
Peter Anthony Francis
francis at jlab.org
Wed Apr 18 13:52:42 EDT 2012
No Problem, Mike T is really interested in getting IPM0R04's RF module
replaced.
On 4/18/2012 6:49 AM, Joe Grames wrote:
> Hi Pete - Tomorrow's plan didn't include an access to the NL. Of
> course the plan can always change if this is important, but a NL
> access would slow down the start of beam studies because we'd like the
> NL in BP possibly as early at ~7:30am again; barely enough time for
> the survey.
>
> Joe
>
> Peter Anthony Francis wrote:
>> I just read Jay B's response, so if there happens to be a access for the
>> North Linac on Thursday I will be on it, if not, we will just have to wait.
>>
>>
>> On 4/18/2012 6:23 AM, Peter Anthony Francis wrote:
>>
>>> Yes, this RF module is in the North Linac. I would need restricted or
>>> controlled access to replace IPM0R04's RF module on Thursday.
>>>
>>>
>>> On 4/17/2012 8:57 PM, Michael Tiefenback wrote:
>>>
>>>> Please ensure that Pete Francis has opportunity to get the IPM0R04
>>>> SEE electronics box swapped out during the early access (if
>>>> possible). It may be in the NL segment. It would be good if he can
>>>> do that -- the BPM was reading 75% of what it should have read, and
>>>> it would be great to be able to 1) look at the box's response on the
>>>> bench, and 2) try the system out with a different electronics box
>>>> downstairs.
>>>>
>>>> Thanks.
>>>>
>>>> Michael Tiefenback
>>>>
>>>> Jay Benesch wrote:
>>>>
>>>>> Feel free to forward this.
>>>>>
>>>>> 0700 RadCon survey of SL and then BSY
>>>>>
>>>>> 0730 SRF entry into SL for piezo work, estimate 6 hours to complete
>>>>> http://opsweb.acc.jlab.org/CSUEApps/atlis/task/12322
>>>>> is the only ATLis I can find
>>>>>
>>>>> 0700 injector work in parallel, likely a two hour PEPPO test
>>>>>
>>>>> 0745 halls can request of PD controlled or restricted access
>>>>>
>>>>> 0900? gun HV off, short injector entry, QE scan, etc. total ~1h
>>>>>
>>>>> 0900-1200 ten ARMs will be in refresher course in RadCon trailer
>>>>>
>>>>> 1000-1600 additional PEPPO tests
>>>>>
>>>>> 1300 begin RF recovery of two zones in NL turned off last week
>>>>>
>>>>> 1330 lock up SL and BSY
>>>>>
>>>>> 1400 C100 work begins from upstairs
>>>>>
>>>>> 1415-1630 BIW tours. Four busloads visiting MCC, FEL, Hall D, ?
>>>>> Arne, Mike T., Todd S. and Jay talking at MCC.
>>>>>
>>>>> 1430 begin RF recovery of six SL zones turned off last week
>>>>>
>>>>> 1600 bring up magnets and as much RF as possible
>>>>> DC power support needed as something will have broken due to
>>>>> on/off/on cycle
>>>>> Use BURT and MST to get correct BdLs into magnets
>>>>>
>>>>> 1630 spot move, Wien flip and HWien set ~1.5 hours
>>>>>
>>>>> 1800 high current setup at 61.6 MeV
>>>>>
>>>>> 2000 C100 work ends. Restore 548/linac begins in earnest.
>>>>> http://opsweb.acc.jlab.org/CSUEApps/atlis/task/12320
>>>>>
>>>>> ~2200 first pass beam around with all cavities phased
>>>>>
>>>>> ~2359 ready to RF separate first pass to A, third to C. Fifth to B
>>>>>
>>>>> Friday
>>>>>
>>>>> 0400?? low current beam to A, B, C. C will take under 3uA to ~1300.
>>>>>
>>>>> 1300-1700 high current setup to C including C100 tuning as required
>>>>>
>>>>> 1300-1600 ten ARMs in refresher course in RadCon trailer
>>>>>
>>>>> 1300-1500 Qweak physics meeting
>>>>> _______________________________________________
>>>>> Bteam mailing list
>>>>> Bteam at jlab.org <mailto:Bteam at jlab.org>
>>>>> https://mailman.jlab.org/mailman/listinfo/bteam
>>>>>
>> _______________________________________________
>> Bteam mailing list
>> Bteam at jlab.org <mailto:Bteam at jlab.org>
>> https://mailman.jlab.org/mailman/listinfo/bteam
>>
-------------- next part --------------