Looking good for beam to BSY early Monday, CW Monday day with bunch
length/inj. phasing optimization.
Tuesday is looking to be a maintenance day.
I've been limiting the plan view to the present and next calendar day +
Tuesday Day Shift, in these emails. If anyone wants the complete view
please let me know.
Arne
Spring 2015 Startup Evolution
1 Spring 2015 StartUp OPS
1.1 Spreadsheet
* Run Spread Sheet
<https://docs.google.com/spreadsheets/d/1AMVnjOjYZAqxLSQI_bzgt4cbmZlRY0DIh6uUaYCadPk/pubhtml>
* Please send me your gmail address if you wish to have edit privileges
1.2 2015-02-15 Sun
1. |[5/7]| Day
* |[X]| NL phasing
* |[X]| Load in Injector Match values
o elogs: 3320684 <https://logbooks.jlab.org/entry/3320684>
3320685 <https://logbooks.jlab.org/entry/3320685> 3320686
<https://logbooks.jlab.org/entry/3320686>
* |[ ]| re-measure Injector Emittance/TWISS
o *defer to after 0L04 phasing*
* |[X]| restore beam to 1R
* |[ ]| Measure Inj. Chicane M56 (Krafft)
o *defer until ???*
* |[X]| ORFP
* |[X]| 1E emittance/TWISS measurements (Tief?/Spata?)
o Match calculated offline, to be loaded Tuesday Day shift
o harp scans accumulated, harpAnalyzer needed to be modified
so that it would find and fit peaks.
o elogs: 3320724 <https://logbooks.jlab.org/entry/3320724>
3320723 <https://logbooks.jlab.org/entry/3320723>
2. |[0/3]| Swing
* |[ ]| SL phasing
* |[ ]| Beam to 2R
* |[ ]| ORFP
1.3 2015-02-16 Mon
1. |[0/5]| Owl
* |[ ]| Beam to 2R
* |[ ]| ORFP
* |[ ]| Arc1 M56 = 0
* |[ ]| 2E emittance/TWISS measurement
o Match calculated offline, to be loaded Tuesday Day shift
* |[ ]| Extract 1-pass to BSY dump
2. |[0/6]| Day
* |[ ]| 1-pass to BSY dump
* |[ ]| Go CW!
* |[ ]| Optimize Inj. bunching/phasing(0L04)
o Kazimi
o Tief
o Ahmad Mahmoud
* |[ ]| Bunch length measurement via Inj SLM
* |[ ]| Bunch length measurement via Arc1 SLM
* |[ ]| Energy Spread via Inj and Arc1 SLM
3. |[0/3]| Swing - BS
* |[ ]| CW 1-pass to BSY Dump
* |[ ]| RTI test at 2GeV, 125MHz rep. rate.
o 50μ A avg. beam current
o 125MHz rep.rate
o bunch charge equivalent to 200μ A at 499MHz repetition rate
* |[ ]| or lower machine to 1GeV per pass
o 100μ A avg. beam current
o 249.5MHz repetition rate
o bunch charge equivalent to 200μ A at 499MHz repetition rate
1.4 2015-02-17 Tue
1. |[0/4]| Day
* |[ ]| *Punch list, limited access AM & PM?*
o |[ ]| FML Power Loop Config (4h) (West Arc Mag off)
o |[ ]| Hall-B Laser (8h)
o |[ ]| Inj sync light camera (1h)
o |[ ]| NL05 Resurrection (?h)
o |[ ]| Arc6 Water Flow
* |[ ]| restore CEBAF to configuration energy
* |[ ]| load 1E and 2E match
* |[ ]| beam back to 2R
Author: Arne Freyberger
Created: 2015-02-15 Sun 18:57
Emacs <http://www.gnu.org/software/emacs/> 24.3.1 (Org
<http://orgmode.org> mode 8.0-pre)
Validate XHTML 1.0 <http://validator.w3.org/check?uri=referer>
--
Arne Freyberger
Director of Accelerator Operations
Jefferson Lab
12000 Jefferson Avenue Cell: (757) 876-6289
Postal Suite 19 Email: freyberg at jlab.org
Newport News, VA 23606
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/bteam/attachments/20150215/c63709fe/attachment-0002.html>
More information about the BTeam
mailing list